
7. On Block 2 systems, wrap the outside of the feedthrough port with
tape to block off the air holes.
8. From the outside the chamber, install the feedthrough until the tool
touches the chamber feedthrough port. The O-rings hold it in place.
9. Mask the area around the feedthrough port inside the chamber to
prevent the epoxy from spilling on the chamber.
10. Carefully and slowly pour the adhesive into the feedthrough opening.
Be careful not to trap air while pouring. Use a metal probe to break
any trapped air pockets.
Figure 7-8. Feedthrough Diagram
Figure 7-9. Block 2 Feedthrough
Removal/Replacement
Door and Chamber Subsystem
ASP Service Guide rev D
STERRAD® 100 Sterilizer
7-25
Summary of Contents for STERRAD 100
Page 284: ......
Page 285: ......
Page 286: ......
Page 287: ......
Page 288: ......
Page 289: ......
Page 290: ......
Page 291: ......
Page 292: ......
Page 293: ......
Page 294: ......
Page 295: ......
Page 296: ......
Page 297: ......
Page 298: ......
Page 299: ......
Page 300: ......
Page 301: ......
Page 302: ......
Page 303: ......
Page 304: ......
Page 305: ......
Page 306: ......
Page 307: ......
Page 308: ......
Page 309: ......