Service Action Table
Use the product certification procedures to verify sterilizer performance
whenever the service actions listed in the following table are completed.
Service Action Performed
Product Certification Test Requirements
PM 1
All tests (except Baratron Zero Shift Test)
PM 2
All tests
All Service
Leak back test RF power measurement door and chamber
temperature injection and diffusion pressure after 20
minutes (diffusion pressure does not apply to STERRAD
100
S
Systems).
Replace vacuum subsystem
components
Leak back test RF power measurement door/chamber
temperature manual injection procedure (run complete cycle).
Replace RF subsystem
components
Leak back test RF power measurement door and chamber
temperature.
Replace AC enclosure
components
Leak back test RF power measurement door and chamber
temperature door /chamber heater voltage injector valve
heater voltage.
Replace pneumatic
components
Pneumatic pressure switch.
Replace controller or
components
Power supply check A/D set point door and chamber
temperature.
Replace injection system
components.
Injector valve height injector pump floating guide cassette
optics leak back test Leak back test RF power measurement
door and chamber temperature.
Replace door sensors
Door operation and complete cycle
Replace printer
Verify editor function and perform complete cycle
Introduction
Product Certification
ASP Service Guide rev. D
STERRAD® 100 Sterilizer
13-3
Summary of Contents for STERRAD 100
Page 284: ......
Page 285: ......
Page 286: ......
Page 287: ......
Page 288: ......
Page 289: ......
Page 290: ......
Page 291: ......
Page 292: ......
Page 293: ......
Page 294: ......
Page 295: ......
Page 296: ......
Page 297: ......
Page 298: ......
Page 299: ......
Page 300: ......
Page 301: ......
Page 302: ......
Page 303: ......
Page 304: ......
Page 305: ......
Page 306: ......
Page 307: ......
Page 308: ......
Page 309: ......