background image

 

 

INSTRUCTIONS BOOK 

PRADA NARGESA, S.L 

Ctra. de Garrigàs a Sant Miquel s/n  ·  17476 Palau de Santa Eulàlia (Girona) SPAIN 

Tel. +34 972568085  ·  [email protected]  ·  www.nargesa.com 

END WROUGHT IRON MACHINE  

PC16 

Summary of Contents for PC16

Page 1: ...INSTRUCTIONS BOOK PRADA NARGESA S L Ctra de Garrig s a Sant Miquel s n 17476 Palau de Santa Eul lia Girona SPAIN Tel 34 972568085 nargesa nargesa com www nargesa com END WROUGHT IRON MACHINE PC16...

Page 2: ...Thank you for choosing our machines www nargesa com...

Page 3: ...raulic maintenance 3 2 Lubrication 3 3 Cleaning maintenance 3 4 Adjustment of guides 3 5 Regulation of brake 4 INSTALLMENT AND START UP 4 1 Location of the machine 4 2 Working site 4 3 Admissible oute...

Page 4: ...ne The purpose of the hot forging machine NARGESA PC16 is to ease up the the work of winding the hot iron by rolling up the hot extremes of flat bars NOTE Any application other than the specified and...

Page 5: ...INSTRUCTIONS BOOK FOR HOT WROUGHT IRON MACHINE PC16 4 1 3 Identification of the machine Working area Cylinder for clamping material Front support Starting part Electric box Operating controls...

Page 6: ...se Intensity 9 5 A Hydraulic pressure 210 Kg cm2 Hydraulic pump 7 5 liters minute 27 liter container Weight 310 Kg 1 5 Identification of safety protections Back cover It is FORBIDDEN to work without s...

Page 7: ...ck The lower part of the machine will be lifting point which has been designed for this purpose as it described below The risk of overturning the machine must be kept in mind 2 2 Storage conditions Re...

Page 8: ...NARGESA forging machine has hydraulic mechanisms will its oil container won t need to be periodically checked up For this purpose the container is provided with a sightglass 1 that allows us to observ...

Page 9: ...ging machine NARGESA PC16 metal waste such slag etc is generated and this may affect the well performance of it Therefore it is recommended to clean the machine especially in the area of the guides at...

Page 10: ...mes already graduated and it is advi sable not handle it If it is necessary to adjust the guides it is recommended also checking up the brake as well because due to the new set of the guides it is pos...

Page 11: ...surface so it can be levelled It can be clam ped to the ground if desired through the holes made on its base for that purpose 4 2 Working site In order to use the forging machine NARGESA PC16 it is es...

Page 12: ...is designed to be connected to an outlet 230 400 volt three phase 50 60 Hz When connecting make sure that the electric motor rotates in the correct direction the direction is indicated by the sticker...

Page 13: ...et where you can identify the various controls of the machine These controls are located in the following picture 5 2 Start up To start up the forging machine NARGESA PC16 it will need to be connected...

Page 14: ...d beginning 3 4 mm in the direction of the spiral This part consists of several slots of different widths which allow us to bend the tip of the material to which the beginning of the spiral is desired...

Page 15: ...le the zipper moves After reaching the final position of the zipper it is lifted the material is released and goes back to the start point This maneuver depends on the mode of operation used To ease u...

Page 16: ...select the Automatic mode of operation we press the key located in the control panel A message will show up on screen CHANGE TO AUTOMATIC pressing again to Automatic key the machine will start on thi...

Page 17: ...light up No power supply Make sure the machine is properly connected to power supply Some phase power is faulty Make sure we get the three phase tension Maneuver Thermal protection is disa bled Reset...

Page 18: ...rmed by pressing the center of the coil If so please contact te chnical support NARGESA We found that manually maneuver is performed by pressing the center of the coil If it does not contact the techn...

Page 19: ...s manual Use gloves when handling components of the machine for the work processes Wear homologated safety googles and protective boots Hold up the base material Do not work without the protections th...

Page 20: ...Thecnical annex Hot wrought iron machine PC16 List of parts Material cylinder Cylinder Hydraulic group Electric box Electric map Hydraulic map...

Page 21: ...INSTRUCTIONS BOOK FOR HOT WROUGHT IRON MACHINE PC16 B20 A1 List of parts...

Page 22: ...INSTRUCTIONS BOOK FOR HOT WROUGHT IRON MACHINE PC16 B21...

Page 23: ...INSTRUCTIONS BOOK FOR HOT WROUGHT IRON MACHINE PC16 B22...

Page 24: ...INSTRUCTIONS BOOK FOR HOT WROUGHT IRON MACHINE PC16 B23...

Page 25: ...INSTRUCTIONS BOOK FOR HOT WROUGHT IRON MACHINE PC16 B24...

Page 26: ...INSTRUCTIONS BOOK FOR HOT WROUGHT IRON MACHINE PC16 B25 A2 Material cylinder...

Page 27: ...INSTRUCTIONS BOOK FOR HOT WROUGHT IRON MACHINE PC16 B26...

Page 28: ...INSTRUCTIONS BOOK FOR HOT WROUGHT IRON MACHINE PC16 B27 A3 Cylinder...

Page 29: ...INSTRUCTIONS BOOK FOR HOT WROUGHT IRON MACHINE PC16 B28...

Page 30: ...INSTRUCTIONS BOOK FOR HOT WROUGHT IRON MACHINE PC16 B29 A4 Hydraulic group...

Page 31: ...INSTRUCTIONS BOOK FOR HOT WROUGHT IRON MACHINE PC16 B30...

Page 32: ...INSTRUCTIONS BOOK FOR HOT WROUGHT IRON MACHINE PC16 B31...

Page 33: ...INSTRUCTIONS BOOK FOR HOT WROUGHT IRON MACHINE PC16 B32 A5 Electric box...

Page 34: ...INSTRUCTIONS BOOK FOR HOT WROUGHT IRON MACHINE PC16 B33...

Page 35: ...INSTRUCTIONS BOOK FOR HOT WROUGHT IRON MACHINE PC16 B34 A6 Electric map...

Page 36: ...T IRON MACHINE PC16 B35 A7 Hydraulic map 1 Filtro 2FA15R125N 2 Bomba hidr ulica 1L 7 5 DE10R 3 Acoplamiento El stico 4 Motor El ctrico 2 2 Kw 1400 rpm 5 Limitadora de Presi n 5RLL02P2F 03 6 Electrov l...

Page 37: ...tration 3 Complete the form with your details and press 4 Message Sent confirms your data has been successfully sent to Prada Nargesa SL Your machine has been registered and has a warranty of three ye...

Reviews: