1. Product Outline
13
1.4.
Part Names and Functions
Fig. 1-1 Back, Front, LEDs
● Power port
Connect the supplied power cord into the port and connect the other end into an
electric outlet.
● Power cord hook block
Hooking the supplied power cord on the block makes the cord less likely to be
unplugged from the power port.
● Ground terminal
Connect the earth terminal screw and grounding surface using the earth wire.
● SD card slot
Insert a SD card to change configuration information and change and save firm
-
ware.
● 10BASE-T/100BASE-TX/1000BASE-T port (Ports 1 to 28)
Connect a 10BASE-T/100BASE-TX/1000BASE-T terminal hub repeater Switching
Hub. The length of the copper cabling (CAT5e or higher) connecting this Switching
Hub and a device must be 100 m or shorter.
Summary of Contents for ZEQUO 2200
Page 3: ...3 ...
Page 86: ...7 ARP Commands 86 ...
Page 93: ...9 Auto Configuration Commands 93 ...
Page 273: ...30 IPv6 NDP Commands 273 ...
Page 330: ...36 LLDP Commands 330 ...
Page 361: ...39 MAC based Access Control Commands 361 ...
Page 461: ...49 Protocol VLAN Commands 461 ...
Page 483: ...50 QoS Commands 483 ...
Page 504: ...53 SNMPv1 v2 v3 Commands 504 Only Administrator level users can issue this command ...
Page 523: ...53 SNMPv1 v2 v3 Commands 523 ...
Page 562: ...57 Subnet VLAN Commands 562 ...