2. Installation
16
2. Installation
2.1.
Installing in a 19-inch Rack
Take out two mount brackets and eight screws (for securing the mount brackets to
the Switching Hub) from accessories, and secure a bracket to each of the right and
left sides of the Switching Hub via four screw holes.
Then, by using four supplied screws (for 19-inch rack mount) or screws included with
the rack, firmly mount the Switching Hub in the rack.
Fig. 2-1 Installing in 19-inch Rack
The main unit can be placed 20 mm back on the rack by changing the bracket fixing
position.
Fig. 2-2 Installing in 19-inch Rack (20 mm backword mounting)
Summary of Contents for ZEQUO 2200
Page 3: ...3 ...
Page 86: ...7 ARP Commands 86 ...
Page 93: ...9 Auto Configuration Commands 93 ...
Page 273: ...30 IPv6 NDP Commands 273 ...
Page 330: ...36 LLDP Commands 330 ...
Page 361: ...39 MAC based Access Control Commands 361 ...
Page 461: ...49 Protocol VLAN Commands 461 ...
Page 483: ...50 QoS Commands 483 ...
Page 504: ...53 SNMPv1 v2 v3 Commands 504 Only Administrator level users can issue this command ...
Page 523: ...53 SNMPv1 v2 v3 Commands 523 ...
Page 562: ...57 Subnet VLAN Commands 562 ...