299
Pulse Outputs
Section 5-3
Remarks
1,2,3...
1.
PLS22(887) used a relative pulse setting. This enables operation even if
the origin is not defined. The present position in A276 (lower 4 digits) and
A277 (upper 4 digits) is set to 0 before pulse output and then contains the
specified number of pulses.
2.
ACC(888) can be used instead of SPED(885) for the jog operation. If
ACC(888) is used, acceleration/deceleration can be included in the jog op-
eration.
Vertically Conveying PCBs (Multiple Progressive Positioning)
Specifications and
Operation
■
Outline
1,2,3...
1.
PCBs with components mounted are stored in a stocker.
2.
When a stocker becomes full, it is moved to the conveyance point.
Positioning Operation for Vertical Conveyor
■
Operation Pattern
1,2,3...
1.
An origin search is performed.
2.
Fixed-distance positioning is repeated.
(2)
(3)
(1)
Stocker conveyance
position
From mounter
Summary of Contents for CP1H CPU UNITS - PROGRAMMING 05-2007
Page 2: ......
Page 3: ...CP1H X40D CP1H XA40D CP1H Y20DT D CP1H CPU Unit Operation Manual Revised March 2009...
Page 4: ...iv...
Page 10: ...x...
Page 18: ...xviii...
Page 22: ...xxii...
Page 34: ...xxxiv Conformance to EC Directives 6...
Page 174: ...140 CP series Expansion I O Unit Wiring Section 3 6...
Page 370: ...336 Analog I O XA CPU Units Section 5 5...
Page 552: ...518 Trouble Shooting Section 8 7...
Page 595: ...561 Sample Application Section 9 12 Network Settings Network Tab Network Settings Driver Tab...
Page 598: ...564 Sample Application Section 9 12...
Page 642: ...608 Standard Models Appendix A...
Page 652: ...618 Dimensions Diagrams Appendix B...
Page 745: ...711 Connections to Serial Communications Option Boards Appendix F Connecting to Unit...
Page 746: ...712 Connections to Serial Communications Option Boards Appendix F...
Page 776: ...742 PLC Setup Appendix G...
Page 778: ...744 Specifications for External Power Supply Expansion Appendix H...
Page 786: ...752 Revision History...