![background image](http://html.mh-extra.com/html/macdon/flexdraper-fd1-series/flexdraper-fd1-series_operators-manual_685695353.webp)
9. Reinstall the inspection panel (B) and secure with four
bolts (A).
Figure 5.53: Auger Drive
5.7.3
Removing Auger Drive Chain
The chain tensioner can take up slack for only a single pitch. Replace the chain when the chain has worn or
stretched beyond the limits of the tensioner.
DANGER
To avoid bodily injury or death from unexpected start-up of machine, always stop engine and remove key
from ignition before leaving operator’s seat for any reason.
NOTE:
Factory-installed chain does not have a connector. Replace chain with endless chain, MD #220317.
NOTE:
To help with the removal of plastic drive covers, tilt the header all the way back (position 0) to maximize the
space between the auger and the feed pan.
1. Detach the header from the combine. Refer to
4 Header Attachment/Detachment, page 225
2. Shut down the combine, and remove the key from the ignition.
147831
335
Revision A
Summary of Contents for FlexDraper FD1 Series
Page 2: ...FD1 Series FlexDraper Header for Combines Published April 2016 ...
Page 3: ...Declaration of Conformity 147831 i Revision A ...
Page 4: ...147831 ii Revision A ...
Page 5: ...147831 iii Revision A ...
Page 6: ...147831 iv Revision A ...
Page 8: ......
Page 10: ......
Page 34: ......
Page 40: ...PRODUCT OVERVIEW Figure 2 1 Header Width 147831 22 Revision A ...
Page 462: ......
Page 484: ......
Page 508: ......
Page 509: ......