![background image](http://html.mh-extra.com/html/macdon/flexdraper-fd1-series/flexdraper-fd1-series_operators-manual_685695327.webp)
Every 250 Hours
Use high temperature extreme pressure (EP2) performance with 1% max molybdenum disulphide (NLGI Grade 2)
lithium base unless otherwise speci
fi
ed.
Figure 5.9: Every 250 Hours
A - Upper Cross Auger U-joint and Bearing
12
B - Upper Cross Auger Bearing (Two Places)
C - Reel U-joint (One Place)
D - Flex Linkage (Two Places) - Both Sides
12. U-joint has an extended lubrication cross and bearing kit. Stop greasing when greasing becomes dif
fi
cult or if
U-joint stops taking grease. Overgreasing will damage U-joint. Six to eight pumps are suf
fi
cient at
fi
rst grease
(factory). Decrease grease interval as U-joint wears and requires more than six pumps.
147831
309
Revision A
Summary of Contents for FlexDraper FD1 Series
Page 2: ...FD1 Series FlexDraper Header for Combines Published April 2016 ...
Page 3: ...Declaration of Conformity 147831 i Revision A ...
Page 4: ...147831 ii Revision A ...
Page 5: ...147831 iii Revision A ...
Page 6: ...147831 iv Revision A ...
Page 8: ......
Page 10: ......
Page 34: ......
Page 40: ...PRODUCT OVERVIEW Figure 2 1 Header Width 147831 22 Revision A ...
Page 462: ......
Page 484: ......
Page 508: ......
Page 509: ......