Deployment AI_DI Unit).......................................................................................................................................................... 133
6.4.1.2 Commissioning a Door Status Sensor (Connected to the AI/DI Port on the Rack Environment Unit)
......................................................................................................................................................................................................... 134
6.4.1.3 Commissioning a Door Status Sensor (Connected to the AI/DI Port on the UIM20A Expansion
Module)........................................................................................................................................................................................ 135
6.4.1.4 Commissioning the Door Status Sensor (Connected to the ECC800-Pro)...............................................136
6.4.2 Commissioning an Access Control Device and a Cabinet Electronic Lock or Fingerprint Lock............137
6.4.3 Commissioning the Exit Button, Skylight Button, Atmosphere Light, Emergency Button, and
Magnetic Lock.............................................................................................................................................................................143
6.4.4 Commissioning an Emergency Door Release Button......................................................................................... 145
6.5 Video Management........................................................................................................................................................... 145
6.5.1 Reference Documentation........................................................................................................................................... 145
6.5.2 Networking Scenarios....................................................................................................................................................145
6.5.3 Commissioning a Camera (Smart ETH Gateway Networking Scenario).....................................................146
6.5.3.1 Commissioning an IPC6325 Camera..................................................................................................................... 147
6.5.3.2 Commissioning an IPC6325 Camera (SD Card Configured)......................................................................... 154
6.5.3.3 Commissioning a C3220 Camera........................................................................................................................... 157
6.5.3.4 Commissioning a C3220 Camera (SD Card Configured)............................................................................... 166
6.5.4 Commissioning a Camera (LAN Switch Networking Scenario)...................................................................... 169
6.5.4.1 Commissioning an IPC6325 Camera..................................................................................................................... 169
6.5.4.2 Commissioning an IPC6325 Camera (SD Card Configured)......................................................................... 174
6.5.4.3 Commissioning a C3220 Camera........................................................................................................................... 177
6.5.4.4 Commissioning a C3220 Camera (SD Card Configured)............................................................................... 185
6.5.5 Commissioning the VCN............................................................................................................................................... 189
6.5.5.1 Initializing VCN510 Disks.......................................................................................................................................... 189
6.5.5.2 Initializing VCN520 or VCN540 Disks................................................................................................................... 191
6.5.5.3 Setting Parameters on the VCN WebUI............................................................................................................... 194
6.5.5.4 Setting Parameters on the VCN IVS Client......................................................................................................... 197
6.5.6 Commissioning the IVS1800........................................................................................................................................200
6.5.6.1 Setting Parameters on the IVS1800 WebUI........................................................................................................200
6.5.6.2 Setting Parameters on the iClient..........................................................................................................................206
6.6 Linkage Control................................................................................................................................................................... 211
6.6.1 FusionModule2000 Linkage Control.........................................................................................................................212
6.6.1.1 Fire Control Linkage....................................................................................................................................................213
6.6.1.2 High Temperature Linkage....................................................................................................................................... 215
6.6.1.3 (Optional) Commissioning an Intelligent Aisle Light..................................................................................... 216
6.6.1.4 Linking the Smoke Alarm with Skylight Open.................................................................................................. 220
6.6.1.5 High-Density Island Linkage....................................................................................................................................222
6.6.2 FusionModule500/800 Linkage Control.................................................................................................................. 224
6.6.2.1 Link Air Conditioner Fault with Emergency Fan............................................................................................... 226
ECC800 Data Center Controller
User Manual
Contents
Issue 04 (2021-10-09)
Copyright © Huawei Technologies Co., Ltd.
vii