Prerequisites
One end of the straight-through cable has been connected to the COM port on
the PDU2000 and the other end has been connected to the COM port on the ETH
converter.
Context
Table 5-14 PDU2000 basic Information
Vendor
Name Displayed on the
WebUI
Eleventh and Twelfth
Characters in Device
Barcode
a
Clever
PDU2000-M(C)
FT
HPXIN
PDU2000-M(H)
6B
a: The barcode starts with 21 and is attached to the device.
Procedure
Step 1 Set the PDU2000 monitoring parameters.
●
Set the PDU2000-M (C) monitoring parameters.
NO TE
The display of a single-phase module is used as an example.
–
After the PDU2000-M (C) is powered on, the LCM displays the
initialization screen.
Figure 5-10 PDU2000-M (C) initialization screen
–
Press MENU to enter the device communications address screen.
Figure 5-11 PDU2000-M (C) communications settings
ECC800 Data Center Controller
User Manual
5 Power-On Commissioning
Issue 04 (2021-10-09)
Copyright © Huawei Technologies Co., Ltd.
121