Power-Up Sequence
Figure 10-3: Power-Up Sequence Recommendation for Cyclone V Devices
To ensure the minimum current draw during device power up for Cyclone V devices, follow the power-up
sequence recommendations as shown in the following figure.
Power up V
CCBAT
at any time. Ramp up the power rails in Group 1 to a minimum of 80% of their full rail
before Group 2 starts. Power up V
CCE_GXB
and V
CCL_GXB
together with V
CC
.
1.1V
VCC
VCCE_GXB
VCCL_GXB
VCC_HPS
2.5V
VCCPGM
VCCIO
VCCPD
VCCA_FPLL
VCCH_GXB
VCC_AUX
VCCPD_HPS
VCCIO_HPS
VCCRSTCLK_HPS
VCCPLL_HPS
VCC_AUX_SHARED
Power rails that are
only available with
Cyclone V SX, SE,
and ST devices.
Group 1
Group 2
This table lists the current transient that you may observe at the indicated power rails after powering up the
Cyclone V device, and before configuration starts. These transients have a finite duration bounded by the
time at which the device enters configuration mode. For Cyclone V SX, SE and ST devices, you may observe
the current transient in the following table after powering up the device, and before all the power supplies
reach the recommended operating range.
For details about the minimum current requirements, refer to the PowerPlay Early Power Estimator (EPE),
and compare to the information listed in the following table. If the current transient exceeds the minimum
current requirements in the PowerPlay EPE, you need to take the information into consideration for your
power regulator design.
Table 10-1: Maximum Power Supply Current Transient and Typical Duration
Typical Duration (µs)
(28)
Maximum Power Supply
Current Transient (mA)
Power Rail
50
1000
V
CCPD
(29)
,
(30)
200
250
V
CCIO
(31)
,
(30)
10
400
V
CC_AUX
(32)
100
350
V
CC
(32)
(28)
Only typical duration is provided as it may vary on the board design.
(29)
You may observe the current transient at V
CCPD
only when you do not follow the recommended power-up
sequence. To avoid the current transient at V
CCPD
, follow the recommended power-up sequence.
(30)
The maximum current for V
CCIO
and V
CCPD
applies to all voltage levels supported by the Cyclone V device.
(31)
You may observe the current transient at V
CCIO
if you power up V
CCIO
before V
CCPD
. To avoid the current
transient at V
CCIO
, follow the recommended power-up sequence by powering up V
CCIO
and V
CCPD
together.
(32)
You may observe the current transient at V
CC_AUX
, V
CC
, and V
CC_HPS
with any power-up sequence.
Power Management in Cyclone V Devices
Altera Corporation
CV-52010
Power-Up Sequence
10-4
2014.01.10