Remote Control
R&S
®
ESRP
904
User Manual 1175.7445.02 ─ 08
In order to recognize when the acquisition of correction data is completed, the MAV bit
in the status byte can be used. If the associated bit is set in the Service Request
Enable Register, the instrument generates a service request after the acquisition of
correction data has been completed.
Return values:
<CalibrationState>
0
The command returns a '0' if calibration was successful.
Example:
*CLS
Resets the status management.
*SRE 16
Enables MAV bit in the Service Request Enable Register.
*CAL?
Starts the correction data recording, and then a service request
is generated.
Usage:
Query only
SCPI confirmed
CALibration:RESult?
This command returns the results collected during calibration.
Return values:
<CalibrationData>
String containing the calibration data.
Example:
CAL:RES?
would return, e.g.
Total Calibration Status:
PASSED, Date (dd/mm/yyyy): 12/07/2004,
Time: 16:24:54,Runtime: 00.06
Usage:
Query only
Manual operation:
See
CALibration:STATe
<State>
This command includes or excludes calibration data in the actual measurement.
Parameters:
<State>
ON | OFF
Example:
CAL:STAT OFF
Sets up the instrument to ignore the calibration data.
Usage:
SCPI confirmed
DIAGnostic<n>:SERVice:INPut:PULSed:CFRequency
<Frequency>
This command defines the frequency of the calibration signal.
System Configuration