![Beckman Coulter UniCel DxC Synchron 600 Скачать руководство пользователя страница 352](http://html.mh-extra.com/html/beckman-coulter/unicel-dxc-synchron-600/unicel-dxc-synchron-600_instructions-for-use-manual_2719768352.webp)
As-Needed/As-Required Maintenance
Replacing the Sample and Reagent Probe
Maintenance
UniCel DxC Systems Instructions For Use A13914
Page 10-106
October 2005
When performing the Vertical Home and wash alignment and verifying the proper
probe position in the collar wash, DO NOT use the screen instruction. The proper
positions are indicated below.
3
Follow the appropriate alignment procedure as described in the UniCel
DxC Synchron Clinical Systems Reference Manual, System Tools
If...
then perform the following
alignments...
the current probe is re-
installed after inspection
without moving the bead
assembly,
no alignments required.
a new MC Sample Probe is
installed,
• MC Sample Probe Vertical Home
and Wash
• MC Sample Probe Sample Height
• MC Sample Probe Cup Height
• MC Sample Probe EIC Height
a new CC Sample Probe is
installed,
• CC Sample Probe Vertical Home
and Wash
• CC Sample Probe Cuvette Height
• CC Sample Probe Sample Height
a new Reagent Probe is
installed in either position,
• Reagent Probe (A or B) Vertical
Home and Wash
• Reagent Probe (A or B) Height in
Cuvette
• Reagent Probe (A or B) Height in
Cartridge
the bead assembly is
removed or repositioned,
all rotary and vertical alignments for
that probe must be performed.
Step
Action
, continued
(2 of 2)