![Beckman Coulter UniCel DxC Synchron 600 Скачать руководство пользователя страница 318](http://html.mh-extra.com/html/beckman-coulter/unicel-dxc-synchron-600/unicel-dxc-synchron-600_instructions-for-use-manual_2719768318.webp)
As-Needed/As-Required Maintenance
Replacing the Sodium Measure/Reference Electrode
Maintenance
UniCel DxC Systems Instructions For Use A13914
Page 10-72
October 2005
Replacing the Sodium Measure/Reference Electrode
The Sodium Measuring Electrode must be prepared before installation of a new
electrode.
Material Required:
• Beaker
• Na/K-free filter paper
• Phillips screwdriver
Follow the steps below to prepare the Sodium electrode (P/N 668295).
10
When system has completed priming, select <Close> to exit the procedure.
11
CAUTION
Pinching Hazard. When lowering the ISE module, keep fingers clear.
Lower the ISE module down into the cavity by releasing the locking pin.
Be careful not to pinch any tubing as the ISE module is lowered.
12
Reinstall the ISE module cover.
13
Calibrate all ISE chemistries. A reference drift for new electrodes may be
observed during the first 4-6 hours after electrode replacement. Results
will NOT be compromised. Recalibrating the chemistry during this time
period will help stabilize the electrode.
Step
Action
, continued
(3 of 3)