![Beckman Coulter UniCel DxC Synchron 600 Скачать руководство пользователя страница 28](http://html.mh-extra.com/html/beckman-coulter/unicel-dxc-synchron-600/unicel-dxc-synchron-600_instructions-for-use-manual_2719768028.webp)
Operational Conditions
Shipping Damage
System Description
UniCel DxC Systems Instructions For Use A13914
Page 2-2
October 2005
Operational Conditions
Shipping Damage
Each DxC System is carefully examined and checked by Beckman Coulter, Inc. before
it is shipped. When you receive your new DxC System, visually inspect the shipping
container for damage. If there is damage, notify the Beckman Coulter Service
Representative before he or she arrives at your facility to install your system.
Installation
Refer to the following table.
Clearances
The system requires the following clearances.
Sunlight and Drafts
Do not place the system in direct sunlight or in drafts. Both of these conditions may
affect the temperature control of the system.
Drain
The system should be located near a sink or floor drain to accommodate the waste
effluent at a minimum rate of 6 liters/hour (16 liters/hour continuous flow).
The drain must not be placed any higher than 36 inches (91.4 cm) above the floor.
Table 2.1
Installation Requirements
Item
Requirement
Installed by
The DxC system is installed completely by Beckman
Coulter
Installation Category
II
Table 2.2
System Clearances
Area Affected
Clearance Needed
Left Side
Minimum of 6 inches (15.2 cm) clearance or 12 inches
(30.5 cm) to access smart modules.
Right Side
Minimum of 18 inches (45.7 cm) clearance when monitor
on swing arm is in use.
Back
Zero inches. The venting design of the system allows for
"0 inch" clearance at the back.
Top
Minimum of 22 inches (55.9 cm) from highest point of
system.
Front
Minimum of 25 inches (63.5 cm) to open doors.