![Beckman Coulter UniCel DxC Synchron 600 Скачать руководство пользователя страница 339](http://html.mh-extra.com/html/beckman-coulter/unicel-dxc-synchron-600/unicel-dxc-synchron-600_instructions-for-use-manual_2719768339.webp)
As-Needed/As-Required Maintenance
Cleaning CO
2
Alkaline Buffer Lines
UniCel DxC Systems Instructions For Use A13914
Maintenance
October 2005
Page 10-93
10
5
Prime the ISE CO
2
Alkaline Buffer 20 times by selecting:
• the Utils icon from the menu bar,
• <1> Prime,
• MC [F4],
• ISE CO
2
Alkaline Buffer check box.
Type 20 in the Number of primes to repeat field.
Select <Start Prime>. Wait for prime cycles to finish.
6
Remove the alkaline buffer reagent straw from the bleach solution and
insert the straw into a container of deionized water.
7
Prime the ISE CO
2
Alkaline Buffer 25 times by selecting the ISE CO
2
Alkaline Buffer check box.
Type 25 in the Number of primes to repeat field.
Select <Start Prime>. Wait for prime cycles to finish.
8
Remove the alkaline buffer reagent straw from the deionized water and dry
the straw with lintless tissue.
9
Reinstall the alkaline buffer reagent cap and straw onto a new bottle of
alkaline buffer reagent.
10
Prime the ISE CO
2
Alkaline Buffer 15 times by selecting the ISE CO
2
Alkaline Buffer check box.
Type 15 in the Number of primes to repeat field.
Select <Start Prime>. Wait for prime cycles to finish.
11
Reconnect line #33 to the reagent bottle. If the tubing does not make a tight
fit, cut off the tip of the end of the tubing and reconnect.
12
Prime the ISE CO
2
Alkaline Buffer 5 times by selecting the ISE CO
2
Alkaline Buffer check box.
Type 5 in the Number of primes to repeat field.
Select <Start Prime>. Wait for prime cycles to finish.
13
Perform a reagent load if a new bottle of alkaline buffer reagent is loaded,
and adjust the alkaline buffer damper volume.
Step
Action
, continued
(2 of 3)