Chapter 12: Basic Bring-up Procedure for a C4c CMTS
STANDARD Revision 1.0
C4® CMTS Release 8.3 User Guide
© 2016 ARRIS Enterprises LLC. All Rights Reserved.
361
configure interface cable-upstream 10/1 cable supervision 15/0
configure interface cable-upstream 10/1 cable supervision 15/1
configure interface cable-upstream 10/1 cable supervision 15/2
configure interface cable-upstream 10/1 cable supervision 15/3
configure interface cable-upstream 10/2 cable supervision 15/0
configure interface cable-upstream 10/2 cable supervision 15/1
configure interface cable-upstream 10/2 cable supervision 15/2
configure interface cable-upstream 10/2 cable supervision 15/3
configure interface cable-upstream 10/3 cable supervision 15/0
configure interface cable-upstream 10/3 cable supervision 15/1
configure interface cable-upstream 10/3 cable supervision 15/2
configure interface cable-upstream 10/3 cable supervision 15/3
configure interface cable-upstream 10/0 no shutdown
configure interface cable-upstream 10/1 no shutdown
configure interface cable-upstream 10/2 no shutdown
configure interface cable-upstream 10/3 no shutdown
configure interface cable-upstream 10/0.0 no shutdown
configure interface cable-upstream 10/1.0 no shutdown
configure interface cable-upstream 10/2.0 no shutdown
configure interface cable-upstream 10/3.0 no shutdown
Note: If the system has been cabled, then legacy modems 1.0, 1.1, and 2.0 will register at this point in the procedure.
Configure Fiber Node and Topology
This section provides commands to configure the fiber node data and assign the channels that were defined in the
previous procedures to those fiber nodes.
Configure fiber nodes 1-4:
configure cable fiber-node FN1
configure cable fiber-node FN1 cable-downstream 15/0 15/1 15/2 15/3
configure cable fiber-node FN1 cable-upstream 10/0
configure cable fiber-node FN2
configure cable fiber-node FN2 cable-downstream 15/0 15/1 15/2 15/3
configure cable fiber-node FN2 cable-upstream 10/1