![Volvo L120E Operator'S Manual Download Page 107](http://html.mh-extra.com/html/volvo/l120e/l120e_operators-manual_1048851107.webp)
Signalling diagram
رﻮﺗاﺮﭘا
ﻲﻳﺎﻤﻨﻫار
ﻢﺋﻼﻋ
106
هﺪﺷ
هرﺎﺷا
ﺖﻬﺟ
رد
ﺖﻛﺮﺣ
ﻒـﻛ
و
دﻮــﺸﻴﻣ
زﺎﺑ
ﻲﻘﻓا
ترﻮﺼﺑ
ار
ﺖﺳد
ﻚﻳ
نﺎـﻣﺰﻤﻫ
و
دﺮﻴــﮕﻴﻣ
راﺮﻗ
ﻦﻴﻳﺎﭘ
فﺮﻃ
ﻪﺑ
ﺖﺳد
.
ﺪﻨﻛ
ﻲﻣ
ﺖﻛﺮﺣ
ﺖﺳار
فﺮﻃ
ﻪﺑ
مارآ
ﺖﺳد
OPERATE IN INDICATED
DIRECTION
The arm extended horizontally with
the palm facing downward and the
arm making small slow movements
to the right
هﺪﺷ
هرﺎﺷا
ﺖﻬﺟ
رد
ﺖﻛﺮﺣ
ﻒـﻛ
و
دﻮــﺸﻴﻣ
زﺎﺑ
ﻲﻘﻓا
ترﻮﺼﺑ
ار
ﺖﺳد
ﻚﻳ
نﺎـﻣﺰﻤﻫ
و
دﺮﻴــﮕﻴﻣ
راﺮﻗ
ﻦﻴﻳﺎﭘ
فﺮﻃ
ﻪﺑ
ﺖﺳد
.
ﺪﻨﻛ
ﻲﻣ
ﺖﻛﺮﺣ
ﭗﭼ
فﺮﻃ
ﻪﺑ
مارآ
ﺖﺳد
OPERATE IN INDICATED
DIRECTION
The arm extended horizontally with
the palm facing downward and the
arm making small slow movements
to the left
ﻲﻘﻓا
ﻪﻠﺻﺎﻓ
.
ﺪﻨﻫد
ﻲﻣ
نﺎﺸﻧ
ار
ﺐﺳﺎﻨﻣ
ﻪﻠﺻﺎﻓ
ﺎﻬﺘﺳد
HORIZONTAL DISTANCE
The hands indicate the relevant
distance
رﺎﺑ
رﺎﻬﻣ
رﺎﻬـﻣ
ﹰﻼﻣﺎـﻛ
ﺮﻴـﺠﻧز
ﻪﻠﻴــﺳﻮﺑ
ﺪﻳﺎﺑ
دﺮﮔ
ﻞﻴﻣ
و
ﻲﺑﻮﭼ
راﻮﻟا
و
ﺎﻫ
ﻪﺘﺨﺗ
.
دﻮﺷ
يﺮﻴﮔﻮﻠﺟ
ﺎﻬﻧآ
طﻮﻘﺳ
زا
ﺎﺗ
ﺪﻨﺷﺎﺑ
هﺪﺷ
Slinging
Boards, planks, reinforcing irons or similar should
have the sling arranged so that they cannot fall out.
صﻮﺼﺨﻣ
هﺮﻴﮔ
ﺖﻔﺟ
ﻚﻳ
زا
ﺪﻳﺎﺑ
ﺎﺤﻴﺟﺮﺗ
ﻦﻫآﺮﻴﺗ
ندﺮﻛ
ﺪﻨﻠﺑ
مﺎﮕﻨﻫ
.
ﺪﻴﻨﻛ
هدﺎﻔﺘﺳا
ﻦﻫآﺮﻴﺗ
When lifting girders, a pair of girder scissors should
preferably be used.
هﺪـﺷ
هﺪﻳﺮﺑ
ﻲﻟﻮﻃ
ﺖﻬﺟ
زا
ﻪﻛ
ﮓﻨﻠﺷ
ﻪﻜﺗ
ﺪﻨﭼ
ﺎﻳ
ﻚﻳ
زا
لﺎﺜﻣ
ياﺮﺑ
.
ﺪﻴﻨﻛ
هدﺎﻔﺘﺳا
ﺰﻴﺗ
يﺎﻫ
ﻪﺒﻟ
رد
ﺪﻧا
Place for example cut-up air hoses between the sling
and sharp edges.
.
ﺪﻴﻨﻛ
ﻢﻜﺤﻣ
ﻲﺑﻮﺨﺑ
ار
ﺎﻫﺮﻴﺠﻧز
ﺎﻳ
و
ﺎﻫ
بﺎﻨﻃ
The sling should be well tightened.