2-20
Installation conditions TLC 1000 and TLC 1005 - Version 5
B337EN02.DOC
O
2
Standard
pressure
O
2
High pressure
6
N
2
High pressure
Min. input pressure
line pressure in
[bar] 8
15
27
Max. input pressure
static
6
[bar] 21
21
34
Max. cutting gas
pressure [bar] 6
12
20
Volume rate of flow
7
[Nm
10
20
55
Nozzle diameter [mm] 1.7
1.7
2.3
Cutting gas supply – machine connection
Cutting gas supply from gas tank
•
Tanks are suitable for supplying gas safely if the gas
consumption is at least about 200 Nm
3
/week.
•
The optimal tank size can be calculated according to the
quantity and to the local regulations.
•
The gas supplier must be consulted in all cases.
•
Requirements for high-pressure cutting with nitrogen:
–
Do not use a tapping point pressure regulator between the
gas tank and the machine after the pressure regulating
station.
–
A stopcock must be installed between the gas tank and the
machine.
O
2
Standard
pressure
O
2
High pressure
8
N
2
High pressure
Nominal pressure
[bar]
18
36
36
Max. tapping pressure
[bar]
14
16
30
Cutting gas supply – tank assembly
6
The machine is equipped with blow-off valves that respond when there is
high input pressure, thereby creating a whistling sound.
7
The volume rate of flow is reached when selecting maximum cutting gas
pressure and specifying nozzle diameter.
8
Only necessary for special applications i.e. laser cutting with oxygen high-
pressure
Requirements at the
connection point
on the machine
Table 2-11
Tank system
Table 2-12
Summary of Contents for LASERCELL 1005
Page 1: ...Operator s manual TRUMPF LASERCELL 1005...
Page 2: ......
Page 3: ...Operator s manual TRUMPF LASERCELL 1005 Edition 07 2004...
Page 6: ...0 6 Before You proceed B337EN00 DOC...
Page 22: ...0 22 Table of Contents B337EN00 DOC...
Page 23: ...1...
Page 61: ...1 38 Laser processing B337EN01 DOC...
Page 62: ...2...
Page 107: ...3...
Page 160: ...4...
Page 408: ...4 248 Operation B337EN4_8 Fig 36634 Fig 36630 4 Select Backup to ZIP press 4 5 Press Enter...
Page 412: ...4 252 Operation B337EN4_8...
Page 413: ...5...
Page 515: ...5 102 Further service programs B337EN05 DOC...
Page 516: ...6...
Page 589: ...7...
Page 628: ...8...
Page 636: ...8 8 Cross hairs to cut out B337EN08 DOC...
Page 637: ...9...
Page 643: ...9 6 Diagram Location of measuring points B337EN09 DOC...
Page 644: ...10...