B337EN4_8
Operation
4-217
13.1 Starting a lubrication cycle
Note:
The safety door of machines with two-station operation has to be
closed before starting the lubrication cycle.
Select Operation >Set-up > Switch elements > Service.
Select "Lubrication cycle".
Press TOGGLE.
The display switches to ON. The lubrication cycle is started.
The "Lubrication cycle" mask appears.
Fig. 36071en
Continue
Press Continue.
The "Current lubrication cycle configuration" mask appears. The
mask shows the lubrication process and the position to which the
Z axis travels during lubrication.
Prerequisite
•
The machine is ready for operation.
•
The home position of the machine has been established.
•
The lubricant well has been filled up.
Summary of Contents for LASERCELL 1005
Page 1: ...Operator s manual TRUMPF LASERCELL 1005...
Page 2: ......
Page 3: ...Operator s manual TRUMPF LASERCELL 1005 Edition 07 2004...
Page 6: ...0 6 Before You proceed B337EN00 DOC...
Page 22: ...0 22 Table of Contents B337EN00 DOC...
Page 23: ...1...
Page 61: ...1 38 Laser processing B337EN01 DOC...
Page 62: ...2...
Page 107: ...3...
Page 160: ...4...
Page 408: ...4 248 Operation B337EN4_8 Fig 36634 Fig 36630 4 Select Backup to ZIP press 4 5 Press Enter...
Page 412: ...4 252 Operation B337EN4_8...
Page 413: ...5...
Page 515: ...5 102 Further service programs B337EN05 DOC...
Page 516: ...6...
Page 589: ...7...
Page 628: ...8...
Page 636: ...8 8 Cross hairs to cut out B337EN08 DOC...
Page 637: ...9...
Page 643: ...9 6 Diagram Location of measuring points B337EN09 DOC...
Page 644: ...10...