E6581611
N-5
14
■
Standard replacement cycles of principal parts
As guides, the table below lists part replacement cycles that were estimated based on the assumption that
the inverter would be used in a normal use environment under normal conditions (ambient temperature,
ventilation conditions, and energizing time). The replacement cycle of each part does not mean its service
life but the number of years over which its failure rate does not increase significantly.
Also, make use of the life alarm function.
Part name
Standard replacement
cycle Note 1:
Replacement mode and others
Cooling fan
10 years
Replacement with a new one (To be determined after
inspection)
Main circuit aluminum
electrolytic capacitor
10 years Note 2
Replacement with a new one (To be determined after
inspection)
Relays
-
Whether to replace or not depends on the check results
Aluminum electrolytic
capacitor mounted on
a printed circuit board
10 years Note 2
Replace with a new circuit board (To be determined after
inspection)
Note 1: The replacement cycle is calculated on the assumption that the average ambient temperature over
a year is 40
C and operates 24 hours a day. The environment must be free of corrosive gases, oil
mist and dust.
Note 2: Figures are for when the inverter output current is 80% of the rated current of the inverter.
Note 3: The life of parts varies greatly depending on the operating environment.
14.3 Making a call for servicing
If defective conditions are encountered, please contact your Toshiba distributor.
When making a call for servicing, please inform us of the contents of the rating label on the right panel of the
inverter, the presence or absence of optional devices, etc., in addition to the details of the failure.
14.4 Keeping the inverter in storage
Take the following precautions when keeping the inverter in storage temporarily or for a long period of time.
1.
Store the inverter in a well-ventilated place away from heat, damp, dust and metal powder.
2.
If no power is supplied to the inverter for a long time, the performance of its large-capacity electrolytic
capacitor declines.
When leaving the inverter unused for a long time, supply it with electricity once every two years, for 5 hours
or more each, to recover the performance of the large-capacity electrolytic capacitor. And also check the
function of the inverter. It is advisable not to supply the commercial power directly to the inverter but to
gradually increase the power supply voltage with a transformer, etc.
Summary of Contents for Q9 Plus ASD
Page 5: ...TM Q9 Plus Bypass ASD Bypass Box INSTALLATION OPERATION MANUAL June 2013 DN 68251 000 ...
Page 61: ...Q9 PLUS ASD LOW VOLTAGE DRIVE ...
Page 65: ...S15 ASD LOW VOLTAGE DRIVE ...
Page 80: ...E6581611 iv 15 Warranty O 1 16 Disposal of the inverter P 1 ...
Page 429: ......
Page 430: ......