Q9 Plus Bypass ASD/Bypass Box Installation and Operation Manual
25
Startup and Test
Before turning on the unit, the following checks are to be performed by
Qualified Personnel
.
•
L1
,
L2
,
and
L3
are connected to the three-phase input power.
•
T1
,
T2
,
and
T3
are connected to the motor.
•
The three-phase input voltage is within the ASD setup tolerances.
•
There are no shorts and all grounds are secured.
•
With the previous checks confirmed, ensure that the direction of the motor rotation in the
Bypass
mode and in the ASD-driven mode is consistent.
•
Ensure that all personnel are clear of the motor and the motor-driven equipment.
Summary of Contents for Q9 Plus ASD
Page 5: ...TM Q9 Plus Bypass ASD Bypass Box INSTALLATION OPERATION MANUAL June 2013 DN 68251 000 ...
Page 61: ...Q9 PLUS ASD LOW VOLTAGE DRIVE ...
Page 65: ...S15 ASD LOW VOLTAGE DRIVE ...
Page 80: ...E6581611 iv 15 Warranty O 1 16 Disposal of the inverter P 1 ...
Page 429: ......
Page 430: ......