Shop Drawing
Review Comments
To (Company):
Market and Johnson
Trade:
HVAC
Attention:
Craig Namyst
From:
Jake Malphurs
Project:
WTC Admin HVAC & Lighting; BP#2
HSR Project No.:
17001
Date Received:
May 16, 2017
Qty. Received:
1 via email
Date Returned:
May 17, 2017
Qty. Returned:
1 via email
CONTRACTOR PLEASE NOTE:
Reviewing is only for conformance with the design concept of the Project and compliance with the information given in the
Contract Documents. The Contractor is responsible for dimensions to be confirmed and correlated at the site for information
that pertains solely to the fabrication process or to the means, methods, techniques, sequences and procedures of
construction and for coordination of the Work of all trades. Corrections or comments made on this Shop Drawing submittal do
not relieve Contractor from compliance with requirements of Contract Documents.
X Review Completed
Rejected as Noted
Additional Information
Exceptions as Noted
Revise and Resubmit
Required as Noted
Comments:
23 05 13 MOTORS
1. Review completed. VFDs are good to go.
Summary of Contents for Q9 Plus ASD
Page 5: ...TM Q9 Plus Bypass ASD Bypass Box INSTALLATION OPERATION MANUAL June 2013 DN 68251 000 ...
Page 61: ...Q9 PLUS ASD LOW VOLTAGE DRIVE ...
Page 65: ...S15 ASD LOW VOLTAGE DRIVE ...
Page 80: ...E6581611 iv 15 Warranty O 1 16 Disposal of the inverter P 1 ...
Page 429: ......
Page 430: ......