167
Basic Setting for Ethernet
Section 6-4
1,2,3...
1.
Lay the twisted-pair cable.
2.
Connect the cable to the hub. Be sure to press in the cable until it locks into
place.
Request cable installation from a qualified professional.
3.
Connect the cable to the connector on the PLC. Be sure to press in the ca-
ble until it locks into place.
6-4
Basic Setting for Ethernet
6-4-1
Overview of Startup Procedure
Note
(1) The local IP address and other parameters can be set from the CX-Pro-
grammer.
(2) It is not necessary step, and the CX-Integrator version 2.53 or higher (CX-
ONE version 4.25 or higher) is required.
When the FINS communications service is used, routing tables must be
created in advance. Routing tables are required in the following circum-
stances.
• When communicating with a PLC or computer on another network
(e.g. remote programming or monitoring using FINS message or a CX-
programmer)
• When routing tables are used for one or more other nodes on the same
network
(3) It is not necessary step.
Determine the local IP address
and address conversion method.
Refer to
Ethernet Units Construction of Networks Operation Manual for CS/CJ Series
(Cat. No. W420-E1) SECTION 5 Determining IP Addresses.
Refer to
6-3 Network Installation.
Connect to the network
using twisted-pair cable.
Create the routing tables.
Perform PLC setup.
(Create IP router tables.)
Turn ON power to the CPU Unit.
(See note 1.)
(See note 2.)
(See note 3.)
Set the IP address freely with the
CX-Programmer.
Connecting to the CPU Unit
without making any settings.
Use auto connection method or
the default IP address.
Refer to
6-4-3 Basic Settings.
Refer to
Ethernet Units Construction of Networks Operation Manual for CS/CJ Series
(Cat. No. W420-E1) 6-4 Creating Routing Tables.
Refer to
6-4-3 Basic Settings.
Summary of Contents for CP1L-EL20DR-D
Page 3: ...CP1L EL20D CP1L EM30D CP1L EM40D CP1L EL EM CPU Unit Operation Manual Produced July 2017...
Page 4: ...iv...
Page 10: ...x...
Page 22: ...xxii...
Page 34: ...xxxiv Software Licenses and Copyrights 7...
Page 192: ...158 Trial Operation and Debugging Section 5 3...
Page 250: ...216 Automatic Clock Adjustment and Specifying Servers by Host Name Section 6 7...
Page 666: ...632 Trouble Shooting Section 11 7...
Page 696: ...662 Standard Models Appendix A...
Page 805: ...771 Connections to Serial Communications Option Boards Appendix F Connecting to Unit...
Page 806: ...772 Connections to Serial Communications Option Boards Appendix F...
Page 836: ...802 PLC Setup Appendix G...
Page 838: ...804 TCP Status Transitions Appendix H...
Page 840: ...806 Ethernet Network Parameters Appendix I...
Page 842: ...808 Buffer Configuration CP1L EL EM Appendix J...
Page 844: ...810 Ethernet Specifications Appendix K...
Page 851: ...Index 817 work words 118 write protection 447...
Page 852: ...818 Index...
Page 854: ...820 Revision History...
Page 855: ......