PLATFORM INSTALLATION
3-9
Edition One
XC1000 Service
3. Remove the burgundy-colored slide panel that covers the circuit breakers
on the power-distribution shelf by pulling it away from the frame.
4. Open the front and rear doors, remove any packing materials, and
remove the grounding straps by pulling the quick-connect lug. Remove
each door as follows:
a. Hold the door and pull down on the spring latch located below
the top hinge of the door.
b. Lift the door off the bottom hinge. Label the door position for
ease of replacement.
5. To prevent cosmetic or other damage, place these doors in a safe place.
6. When facing the front of cabinet 1, remove the right-side cover as
follows:
a. Unscrew the 10 screws that fasten the grounding straps and the
side cover to the cabinet. These 10 screws are located in the
front and back of the cabinet near the edge. Place the screws
and the grounding straps in a safe place.
b. Pull the right-side cover away from the frame.
c.
Reinstall the 10 screws and the grounding strap removed in step 6.a.
7. Remove and save the 10 screws and grounding straps from the right
side of cabinet 2.
8. Attach the right-side cover and the grounding straps (removed in step
6) from cabinet 1 to the right side of cabinet 2. Use the screws saved
in step 7. The facing sides of the cabinets do not have covers.
3.5.1.2
Connecting the Two Cabinets.
Figure 3-4 shows the cabinet-connection
points used to bolt the cabinets together and to connect the intercabinet
signal cables.
Perform the following steps to bolt the two XC1000 cabinets together:
1. Install the four frame-alignment plugs (P/N 065–2008–000) onto the
left side of cabinet 2. Insert the large-diameter end of the plug into the
cabinet frame. Figure 3-7 shows the cabinet-connection points.
2. Secure the four plugs to cabinet 2 using four 8–32 by
5
/
16
–inch
Phillips– head screws (P/N 047–1006–000).
3. Roll the two cabinets together so the frame-alignment plugs enter the
holes in the frame of cabinet 1.
4. From the front of cabinet 1, remove the two mounting screws that
secure the power-distribution assembly to cabinet 1, as shown in
Figure 3-5.
SECTION 3.5
Summary of Contents for XC1000
Page 1: ...EDITION ONE XC1000 P N 101 1345 000 SERVICE MANUAL ...
Page 8: ...CONTENTS ...
Page 19: ...1 INTRODUCTION ...
Page 30: ...2 SITE PREPARATION ...
Page 60: ...3 PLATFORM INSTALLATION ...
Page 112: ...4 STARTUP AND INITIALIZATION ...
Page 177: ...5 ROUTINE MAINTENANCE ...
Page 195: ...6 TROUBLESHOOTING ...
Page 237: ...7 STATUS LOG ...
Page 297: ...STATUS LOG 7 54 Edition One XC1000 Service ...
Page 302: ...8 REPAIR AND REPLACEMENT ...
Page 380: ...9 SYSTEM UTILITIES ...
Page 424: ...10 COMPONENT DESCRIPTIONS ...
Page 465: ...11 OPTIONAL FEATURES ...
Page 485: ...12 RELEASE 1 55 UPGRADE INSTRUCTIONS ...
Page 516: ...13 RELEASE 2 X UPGRADE INSTRUCTIONS ...
Page 559: ...14 RELEASE 3 02 FCP CONVERSION INSTRUCTIONS ...
Page 603: ...15 RELEASE 3 02 ONLINE UPGRADE INSTRUCTIONS ...
Page 631: ...16 RELEASE 3 0 SYSTEM UTILITIES ...
Page 683: ...17 RELEASE 4 X FCP CONVERSION INSTRUCTIONS r P N 281 0023 002 1 of 3 ...
Page 725: ...18 RELEASE 4 X ONLINE UPGRADE INSTRUCTIONS r P N 281 0023 002 2 of 3 ...
Page 760: ...19 RELEASE 4 0 SYSTEM UTILITIES P N 281 0023 002 Part 3 of 3 r ...
Page 776: ...20 RELEASE 4 1 SYSTEM UTILITIES P N 281 0033 000 ...
Page 787: ...APPENDIXES ...