2.1 OVERVIEW
Before installing a XC1000, the site where the XC1000 will be located must be
prepared to meet specific requirements. This chapter contains instructions for
preparing the site, including information about equipment location; cabling
and connector requirements; and procedures for installing external power, data
links, telephone wiring, and floor mounts. The sections about cabling assist in
determining cable lengths and connector locations. These procedures should
be accomplished before delivery of the XC1000.
The customer must supply the –48 Vdc power for the XC1000 –48 Vdc input-
power requirement.
Before preparing the site for installing the XC1000, refer to Chapter Ten for
descriptions of the XC1000 components. Determine the environmental and
power needs for XC1000 and observe all distance and length limitations
specified in this chapter. Use shielded cable for all telephone wiring and data
connections to external hardware. The customer is responsible for all equip-
ment not supplied by Octel and for meeting XC1000 site requirements.
Figure 2-1 shows the flow of the relevant site-preparation tasks discussed
this chapter. Appendix A provides a site-preparation checklist.
DETERMINE THE
CABINET LOCATION
AND
REQUIREMENTS.
INSTALL THE FLOOR
MOUNTS.
PROVIDE –48 VDC
POWER
AND GROUND
THE CHASSIS.
INSTALL THE
SWITCH CABLES.
INSTALL CABLES FOR
ALARM RELAYS AND
DATA LINKS.
INSTALL BUSY-OUT
CONNECTIONS (IF
REQUIRED).
SITE PREPARATION
COMPLETE.
PROCEED WITH
INSTALLATION.
Figure 2-1. Site-Preparation Task Flow.
The following tools and test equipment are required to perform the procedures
in this chapter. Tools and equipment required for specific procedures are
listed in the related sections.
-
Crimping tool (swage)
-
Wire cutter, diagonal
-
RS-232 breakout box
-
Screwdrivers, flat blade, small and medium, minimum 4
1
⁄
2
-inch shaft length
Summary of Contents for XC1000
Page 1: ...EDITION ONE XC1000 P N 101 1345 000 SERVICE MANUAL ...
Page 8: ...CONTENTS ...
Page 19: ...1 INTRODUCTION ...
Page 30: ...2 SITE PREPARATION ...
Page 60: ...3 PLATFORM INSTALLATION ...
Page 112: ...4 STARTUP AND INITIALIZATION ...
Page 177: ...5 ROUTINE MAINTENANCE ...
Page 195: ...6 TROUBLESHOOTING ...
Page 237: ...7 STATUS LOG ...
Page 297: ...STATUS LOG 7 54 Edition One XC1000 Service ...
Page 302: ...8 REPAIR AND REPLACEMENT ...
Page 380: ...9 SYSTEM UTILITIES ...
Page 424: ...10 COMPONENT DESCRIPTIONS ...
Page 465: ...11 OPTIONAL FEATURES ...
Page 485: ...12 RELEASE 1 55 UPGRADE INSTRUCTIONS ...
Page 516: ...13 RELEASE 2 X UPGRADE INSTRUCTIONS ...
Page 559: ...14 RELEASE 3 02 FCP CONVERSION INSTRUCTIONS ...
Page 603: ...15 RELEASE 3 02 ONLINE UPGRADE INSTRUCTIONS ...
Page 631: ...16 RELEASE 3 0 SYSTEM UTILITIES ...
Page 683: ...17 RELEASE 4 X FCP CONVERSION INSTRUCTIONS r P N 281 0023 002 1 of 3 ...
Page 725: ...18 RELEASE 4 X ONLINE UPGRADE INSTRUCTIONS r P N 281 0023 002 2 of 3 ...
Page 760: ...19 RELEASE 4 0 SYSTEM UTILITIES P N 281 0023 002 Part 3 of 3 r ...
Page 776: ...20 RELEASE 4 1 SYSTEM UTILITIES P N 281 0033 000 ...
Page 787: ...APPENDIXES ...