
RELEASE 4.0 SYSTEM UTILITIES
19-3
Release 4.0
XC1000 Service
– Port Testing Administration –
[VP Name]
Port Testing Schedule 1:
Port Testing Schedule 2:
Maximum Time Allowable for Testing: 30 (min)
Phone Number:
Dialing Sequence:
SA/NSA Alarm of Failure: 1 – NSA
Type Of Test: 1 – Dial Tone Detect
Port Range: 1 – All Ports
Figure 19-4. Example of the Port Testing
Administration Screen.
Port tests can be scheduled to run automatically up to twice daily, or they
can be started manually at any time. (Refer to section 19.2.4 for informa-
tion about manual tests.) Two types of port tests, dial-tone detect and
loop-back pass, can be run. Only one type of test can be run at a time.
Sections 19.2.1.1 and 19.2.1.2 describe how to configure the XC1000 for
the two types of tests.
19.2.1.1
Establishing Dial-Tone-Detect Port-Testing Parameters.
Perform dial-
tone-detect tests to verify that specified ports can go off hook and obtain
dial tone from the PBX or Centrex. (If ports can successfully go off hook
for digital switches that do not provide dial tone, the dial-tone-detect test
passes.) Ports are tested randomly, one at a time, until all ports are tested.
To establish dial-tone-detect port-testing parameters, refer to Figure 19-4
and complete the following fields:
Port Testing Schedule 1
. Enter the time that the first scheduled test
should start. Use the format HH:MMA or HH:MMP. The default for this
field is a blank.
If a schedule is established in either
Port Testing Schedule X:
field,
the port test will run at the next scheduled start time. If no schedule
was established, tests will run only when manually started. Refer to
section 19.2.4 for details about performing manual tests.
When performing scheduled maintenance on the XC1000 and a line
card is out of service, it might be necessary to suspend scheduled
testing. To suspend scheduled tests, delete the entry in both of the
Port Testing Schedule X:
fields. To resume scheduled tests, enter
a new time in either of the
Port Testing Schedule X:
fields.
If a manual test is running when a scheduled test is to start, the
scheduled test is skipped. The scheduled test runs the next time it is
due unless there is another conflict with a manual test.
SECTION 19.2
Summary of Contents for XC1000
Page 1: ...EDITION ONE XC1000 P N 101 1345 000 SERVICE MANUAL ...
Page 8: ...CONTENTS ...
Page 19: ...1 INTRODUCTION ...
Page 30: ...2 SITE PREPARATION ...
Page 60: ...3 PLATFORM INSTALLATION ...
Page 112: ...4 STARTUP AND INITIALIZATION ...
Page 177: ...5 ROUTINE MAINTENANCE ...
Page 195: ...6 TROUBLESHOOTING ...
Page 237: ...7 STATUS LOG ...
Page 297: ...STATUS LOG 7 54 Edition One XC1000 Service ...
Page 302: ...8 REPAIR AND REPLACEMENT ...
Page 380: ...9 SYSTEM UTILITIES ...
Page 424: ...10 COMPONENT DESCRIPTIONS ...
Page 465: ...11 OPTIONAL FEATURES ...
Page 485: ...12 RELEASE 1 55 UPGRADE INSTRUCTIONS ...
Page 516: ...13 RELEASE 2 X UPGRADE INSTRUCTIONS ...
Page 559: ...14 RELEASE 3 02 FCP CONVERSION INSTRUCTIONS ...
Page 603: ...15 RELEASE 3 02 ONLINE UPGRADE INSTRUCTIONS ...
Page 631: ...16 RELEASE 3 0 SYSTEM UTILITIES ...
Page 683: ...17 RELEASE 4 X FCP CONVERSION INSTRUCTIONS r P N 281 0023 002 1 of 3 ...
Page 725: ...18 RELEASE 4 X ONLINE UPGRADE INSTRUCTIONS r P N 281 0023 002 2 of 3 ...
Page 760: ...19 RELEASE 4 0 SYSTEM UTILITIES P N 281 0023 002 Part 3 of 3 r ...
Page 776: ...20 RELEASE 4 1 SYSTEM UTILITIES P N 281 0033 000 ...
Page 787: ...APPENDIXES ...