
2.2 Correlation Diagrams of Speed and Payload
D2-146
ME0384-4A
Appendi
x
C
ha
pt
er
2
C
onne
ctabl
e
Ac
tuat
or
s
Correlation diagram of speed and payload for the standard RCP2 rod type
R
A
6
C
Speed (mm/s)
Lead 2.5
Lead 5
Lead 10
Horizontal
Pay
load
(k
g)
Pay
load
(k
g)
Speed (mm/s)
Lead 4
Lead 8
Horizontal
Lead 16
Pay
load
(k
g)
Speed (mm/s)
Lead 4
Lead 16
Vertical
Lead 8
R
A
2
C
R
A
3
C
R
A
4
C
Speed (mm/s)
Lead 2.5
Lead 5
Lead 10
Vertical
Pay
load
(k
g)
Pay
load
(k
g)
Speed (mm/s)
Lead 5
Lead 2.5
Horizontal
Pay
load
(k
g)
Speed (mm/s)
Lead 5
Lead 2.5
Vertical
Speed (mm/s)
Lead 1
Vertical
Pay
load
(k
g)
Horizontal installation
Vertical installation
Speed (mm/s)
Lead 1
Horizontal
Pay
load
(k
g)
Summary of Contents for Rcon
Page 12: ...ME0384 4A ...
Page 32: ...Actuator Coordinate System Intro 20 ME0384 4A ...
Page 42: ...1 3 General Specifications A1 9 ME0384 4A Specifications Section Chapter 1 RCON Overview ...
Page 45: ...ME0384 4A ...
Page 291: ...ME0384 4A ...
Page 323: ...ME0384 4A ...
Page 384: ...1 3 Startup Procedure B1 9 ME0384 4A Startup Section Chapter 1 Overview ...
Page 420: ...3 6 Precautions B3 15 ME0384 4A Startup Section Chapter 3 Absolute Reset ...
Page 588: ...6 2 Various Functions B6 81 ME0384 4A Startup Section ...
Page 837: ......
Page 838: ......