2.2. Wiring
B2-16
ME0384-4A
C
ha
pt
er
2
M
ount
ing
an
d
W
iring
St
art
up
Se
ctio
n
[CC-Link dedicated cable and cable connector wiring method]
Point!
●
The terminal resistor to be used may differ depending on the CC-Link dedicated cable type.
Cable FANC-SBH (CC-Link dedicated high-performance cable): Terminal resistor: 130
Ω
Cable FANC-SB (CC-Link dedicated cable): Terminal resistor: 110
Ω
(1) Prepare a CC-Link dedicated cable.
(2) Strip 7mm of insulation from each wire end.
(3) Insert the stripped wiring in the direction of the arrow in the figure below to the back
of the connector and tighten with a flathead screwdriver.
(4) (
in "Connection image" above)
Attach the controller attached terminal resistor (Note 1) between the connectors DA and
DB at the network terminal end only.
(2)
7mm
* The terminal resistor of the CC-Link master unit is
to be prepared by the customer.
(5) Other CC-Link dedicated cables are wired in the same manner as in (1) to (4).
CC-Link
dedicated cable
(1)
(4)
Terminal resistor
(3)
Flathead
screwdriver
CC-Link
cable connector
(
MSTB2.5/5-STF-5.08AU
)
DA
DB
DG
SLD
FG
"DA" signal line
"DB" signal line
"DG" signal ground
"SLD" shield
Summary of Contents for Rcon
Page 12: ...ME0384 4A ...
Page 32: ...Actuator Coordinate System Intro 20 ME0384 4A ...
Page 42: ...1 3 General Specifications A1 9 ME0384 4A Specifications Section Chapter 1 RCON Overview ...
Page 45: ...ME0384 4A ...
Page 291: ...ME0384 4A ...
Page 323: ...ME0384 4A ...
Page 384: ...1 3 Startup Procedure B1 9 ME0384 4A Startup Section Chapter 1 Overview ...
Page 420: ...3 6 Precautions B3 15 ME0384 4A Startup Section Chapter 3 Absolute Reset ...
Page 588: ...6 2 Various Functions B6 81 ME0384 4A Startup Section ...
Page 837: ......
Page 838: ......