
4.1 How to Use the Gateway Parameter Configuration Tool
B4-24
ME0384-4A
C
ha
pt
er
4
N
etw
or
k C
onf
igu
rat
ion
St
art
up
Se
ctio
n
(5) When the " Confirmation " screen
appears, click .
(6) When the "Information" screen
appears, click .
(7) When the " Parameter
configuration tool" main screen is
loaded, check whether the
changed contents are reflected.
This completes the CC-Link network setting of the RCON system.
Check the communication status between each unit.
Caution
●
For subsequent adjustment, when
operating from the PLC, return the
AUTO/MANU switch on the front of the
gateway unit to AUTO.
●
If left on the MANU side, operation from the
PLC will not be possible.
"Confirmation" screen
Click
"Information" screen
Click
"Parameter configuration tool" main screen
Tilt to the AUTO side
Summary of Contents for Rcon
Page 12: ...ME0384 4A ...
Page 32: ...Actuator Coordinate System Intro 20 ME0384 4A ...
Page 42: ...1 3 General Specifications A1 9 ME0384 4A Specifications Section Chapter 1 RCON Overview ...
Page 45: ...ME0384 4A ...
Page 291: ...ME0384 4A ...
Page 323: ...ME0384 4A ...
Page 384: ...1 3 Startup Procedure B1 9 ME0384 4A Startup Section Chapter 1 Overview ...
Page 420: ...3 6 Precautions B3 15 ME0384 4A Startup Section Chapter 3 Absolute Reset ...
Page 588: ...6 2 Various Functions B6 81 ME0384 4A Startup Section ...
Page 837: ......
Page 838: ......