
9
9
9-124
9-124
Installation > Serial Interface Kit-K1/K2 / Copy Control Interface Kit-A1 > Installation Procedure > Procedure after Work
Installation > Serial Interface Kit-K1/K2 / Copy Control Interface Kit-A1 > Installation Procedure > Procedure after Work
■
Procedure after Work
1) Install the Main Controller PCB 1 to the host machine.
CAUTION:
• Lift the grip and insert the Main Controller PCB 1 and then, after it stops, tilt the grip
and install it with 2 screws.
• Make sure to tilt the grip slowly on both sides simultaneously.
• Check that the Main Controller PCB 1 is installed properly.
Grips
x2
F-9-330
2) Install the USB Cable and the Control Panel Communication Cable.
3) When the Reader is installed, install the Reader Power Cable.
NOTE:
Handle the Reader Power Cable from the connector side and make a slack at [A] part.
Bend the Reader Power Cable at a right angle on [B] part.
x2
[B]
[A]
Connectors
Reader Power Cable
Cable Guide
Wire Saddles
x2
4) Install the Right Rear Cover 1 (3 Screws).
5) Close the Right Lower Cover.
6) Close the Right Upper Cover.
7) Connect the power plug of the host machine to the power outlet.
8) Turn ON the main power switch.
F-9-331