
9
9
9-30
9-30
Installation > Installation Procedure > Execute the ITB Equilibrium Position Detection > ITB Alignment Adjustment
Installation > Installation Procedure > Execute the ITB Equilibrium Position Detection > ITB Alignment Adjustment
6) Loosen 2 screws and move the ITB Motor Support Plate up or down.
Moving it by 1 mm changes the values of ITB-POS and ITB-POS2 by approx. 200.
<When the values are above +350>
Move the ITB Motor Support Plate up.
Loosen
<When the values are below -350>
Move the ITB Motor Support Plate down.
Loosen
F-9-61
F-9-62
7) Tighten 2 screws loosened on the previous step.
8) Install the ITB Motor. (4 Screws, 1 Connector)
9) Install the ITB Cover (2 screws) and close the Front Cover.
10)
Connect the power plug of the host machine to the power outlet.
11)
Open the switch cover and turn ON the main power switch.
12)
Execute the ITB Equilibrium Position Detection Service Mode (Level 1).
• COPIER > FUNCTION > MISC-P > ITB-INIT
imageRUNNER ADVANCE C5240/C5240i/C5235/C5235i: Approx. 4 to 8 minutes
imageRUNNER ADVANCE C5255/C5255i/C5250/C5250i: Approx. 3 to 6 minutes
13)
Check that the value of the following service mode (Level 1) is "-350 to +350".
• COPIER > DISPLAY > MISC > ITB-POS
• COPIER > DISPLAY > MISC > ITB-POS2
14)
If the value of service mode is out of range, perform the [ITB Alignment Adjustment]
again.