
9
9
9-13
9-13
Installation > Installation Procedure > Installing the Drum Unit
Installation > Installation Procedure > Installing the Drum Unit
3) Turn the ITB Release Lever in the direction of the arrow until the protrusion is aligned with
the triangle mark on the plate to release the pressure applied on the ITB.
ITB Pressure Release Lever
F-9-21
4) Pull out the Process Unit until it stops.
x2
F-9-22