9) Install the Image Data Analyzer Board.
• 4 Screws (TP; M3x6)
x4
10)
Install the Main Controller PCB 2.
CAUTION:
• Lift the grip and insert the Main Controller PCB 2. When it touches the end, tilt the grip
and install it with 2 screws.
• Make sure to tilt the grip slowly on both sides simultaneously.
• Check that the Main Controller PCB 2 is installed properly.
x2
Grip
F-9-310
F-9-311
11)
Install the removed cover and the cable.
• Connect the FAX cable.(If the FAX is installed.)
• Install the Left Rear Sub Cover. (1 Screw)
• Install the Reader Communication Cable (if the Reader is installed).
• Install the Left Reader Cover. (2 Screws, 2 Rubber Caps)
Checking after Installation
1) Connect the power plug of the host machine to the power outlet.
2) Turn ON the main power switch.
3) Ask users to install license.
4) Turn OFF/ON the main power switch.
5) Press the counter check key on the control panel.
6) Press "Check Device Configuration" key.
7) Check that "Image Data Analyzer Board" is displayed in option field.