
9
9
9-20
9-20
Installation > Installation Procedure > Installing the Drum Unit
Installation > Installation Procedure > Installing the Drum Unit
CAUTION:
After closing the Process Unit, hold the edge of each Drum Unit from above as
described below.
If the Drum Unit is not secured, it may cause the image failure.
F-9-40
14)
Turn the ITB Pressure Release Lever in the direction of the arrow, and then fit the
projection to the triangle mark on the plate to apply pressure.
CAUTION:
When pressuring the ITB Pressure Release Lever, be sure that the Right Lower Cover
is opened first before pressuring.
15)
Install the ITB Cover, and tighten the 2 screws (which have been loosened).
16)
Release the Waste Toner Lock Lever.
F-9-41
F-9-42