host1(config-if)#
ppp keepalive 50
■
Use the
no
version to disable keepalive.
■
See ppp keepalive.
ppp magic-number disable
■
Use to disable negotiation of the local magic number.
■
Issuing this command prevents the router from detecting loopback configurations.
■
Example
host1(config-if)#
ppp magic-number disable
■
Use the
no
version to restore negotiation of the local magic number.
■
See ppp magic-number disable.
ppp magic-number ignore-mismatch
■
Use to cause the router to ignore a mismatch of the LCP peer magic number and
retain the PPP connection when the peer has not negotiated an LCP magic
number.
■
For more information about using this command, see “Validation of LCP Peer
Magic Number” on page 265.
■
Example
host1(config-if)#
ppp magic-number ignore-mismatch
■
Use the
no
version to restore the default behavior, in which the router terminates
the PPP connection if it detects an LCP peer magic number mismatch.
■
See ppp magic-number ignore-mismatch.
ppp max-negotiations
■
Use to configure the maximum number of LCP, IPCP, or IPv6CP renegotiation
attempts, in the range 1–65535, that the router accepts before terminating a
PPP session.
■
Configuring the maximum number of renegotiation attempts helps avoid massive
renegotiation loops that can occur between the router and a noncompliant PPP
client. Such renegotiation loops can cause excessive CPU utilization and can
prevent the PPP client from coming up properly.
■
When a PPP client exceeds the configured maximum number of renegotation
attempts, the router sends a termination request to end the PPP session. When
the PPP session is terminated and LCP goes into a stopped (closed) state, static
PPP or MLPPP interfaces go into passive mode and wait for the other side of the
connection to start the LCP negotiation process.
■
If you do not specify the optional
lcp
,
ipcp
, or
ipv6cp
keyword, the
ppp
max-negotiations
command sets the maximum number of renegotiation
attempts for each of LCP, IPCP, and IPv6CP to the value you specify, or to the
280
■
Optional Configuration Tasks
JUNOSe 11.1.x Link Layer Configuration Guide
Содержание JUNOSE 11.1.X - LINK LAYER CONFIGURATION 4-7-2010
Страница 6: ...vi...
Страница 8: ...viii JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 26: ...xxvi List of Figures JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 34: ...2 Chapters JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 200: ...168 Monitoring Upper Level Protocols over Ethernet JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 230: ...198 Monitoring VLAN and S VLAN Subinterfaces JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 258: ...226 Monitoring 802 3ad Link Aggregation JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 334: ...302 Troubleshooting JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 394: ...362 Monitoring Multiclass MLPPP JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 406: ...374 Monitoring POS JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 468: ...436 Troubleshooting JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 498: ...466 Monitoring Bridged Ethernet JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 546: ...514 Monitoring Cisco HDLC JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 747: ...Part 2 Index Index on page 717 Index 715...
Страница 748: ...716 Index JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 774: ...742 Index JUNOSe 11 1 x Link Layer Configuration Guide...