Changing VC Subranges
Changing VC subranges within a bulk-configured VC range includes the following
tasks:
■
Adding new VC subranges to an existing VC range
■
Removing VC subranges from an existing VC range
■
Modifying a VC subrange by shortening or expanding the subrange values
■
Merging multiple VC subranges belonging to an existing VC range
■
Changing the administrative state of VC subranges
The following sections describe how to perform these tasks.
Adding VC Subranges
You can add a new VC subrange to an existing VC range only when the new subrange
does not overlap with any existing subrange. Any overlap causes the addition to fail.
You can add multiple subranges to an existing VC range simultaneously. However,
the entire operation fails if even one of the new subranges overlaps with an existing
subrange.
The following example specifies the original VC subranges.
host1(config-if)#
atm bulk-config test vc-range 1 1 101 150 vc-range 2 2 201 250
vc-range 5 5 501 550 vc-range 3 3 301 350
To add subranges to this bulk-configured VC range, you can choose either of the
following methods. Each method adds a new subrange (4, 4, 401, 450) to the existing
VC range, test.
■
Specify one new subrange at a time.
host1(config-if)#
atm bulk-config test vc-range 4 4 401 450
■
Specify the new subrange and all the existing subranges. If you use this method,
all the existing subranges and their order must match exactly, or the operation
fails.
host1(config-if)#
atm bulk-config test vc-range 1 1 101 150 vc-range 2 2 201
250 vc-range 5 5 501 550 vc-range 3 3 301 350 vc-range 4 4 401 450
The following operation fails because the order of subranges does not match the
existing order.
host1(config-if)#
atm bulk-config test vc-range 2 2 201 250 vc-range 1 1 101
150 vc-range 5 5 501 550 vc-range 3 3 301 350 vc-range 4 4 401 450
vc-range 6 6 601 650
Configuring ATM 1483 Dynamic Subinterfaces
■
651
Chapter 18: Configuring Dynamic Interfaces Using Bulk Configuration
Содержание JUNOSE 11.1.X - LINK LAYER CONFIGURATION 4-7-2010
Страница 6: ...vi...
Страница 8: ...viii JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 26: ...xxvi List of Figures JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 34: ...2 Chapters JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 200: ...168 Monitoring Upper Level Protocols over Ethernet JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 230: ...198 Monitoring VLAN and S VLAN Subinterfaces JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 258: ...226 Monitoring 802 3ad Link Aggregation JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 334: ...302 Troubleshooting JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 394: ...362 Monitoring Multiclass MLPPP JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 406: ...374 Monitoring POS JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 468: ...436 Troubleshooting JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 498: ...466 Monitoring Bridged Ethernet JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 546: ...514 Monitoring Cisco HDLC JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 747: ...Part 2 Index Index on page 717 Index 715...
Страница 748: ...716 Index JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 774: ...742 Index JUNOSe 11 1 x Link Layer Configuration Guide...