host1(config-if)#
atm oam 8 seg-loopback cc source
■
Use the
no
version to delete F4 OAM circuits. Using the options, you can delete
all F4 OAM circuits on the interface, segment or end-to-end F4 OAM circuits, or
F4 OAM circuits on a specific VPI.
■
Example 1—Deletes all F4 OAM circuits on the interface
host1(config-if)#
no atm oam
■
Example 2—Deletes all F4 segment OAM circuits on the interface
host1(config-if)#
no atm oam segment
■
Example 3—Deletes the F4 end-to-end OAM circuit on VPI 8
host1(config-if)#
no atm oam 8 end-loopback
■
See atm oam.
Configuring F5 OAM
F5 OAM flows run over existing PVCs. The ATM interface does not support sending
F5 segment loopback cells, but it does respond to F5 segment loopback cells that it
receives.
NOTE:
You cannot enable both loopback cells and CC cells at the same time.
To set up F5 OAM:
1.
To enable VC integrity, which causes the ATM interface to periodically send F5
end-to-end loopback cells over a VC, use the
oam
keyword with the
atm pvc
command.
You can include the frequency (in seconds) with which the router sends F5
end-to-end loopback cells.
host1(config-if)#
atm pvc 98 38 22 aal5snap oam 300
2.
(Optional) To enable CC cell flows on a circuit, use the
cc
keyword with the
atm pvc
command. You can enable cell flows on a segment or end-to-end basis,
and you can enable the PVC as a sink, source, or both a sink and a source.
host1(config-if)#
atm pvc 50 0 50 aal5snap oam cc end-to-end sink
When you issue the appropriate
shutdown
command to change the administrative
status of the corresponding ATM interface, ATM AAL5 interface, or ATM 1483
subinterface from enabled to disabled, the router automatically disables all F5 OAM
services configured on the associated VC. For more information, see “Automatic
Disabling of F5 OAM Services” on page 20.
atm pvc
Configuring OAM
■
35
Chapter 1: Configuring ATM
Содержание JUNOSE 11.1.X - LINK LAYER CONFIGURATION 4-7-2010
Страница 6: ...vi...
Страница 8: ...viii JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 26: ...xxvi List of Figures JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 34: ...2 Chapters JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 200: ...168 Monitoring Upper Level Protocols over Ethernet JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 230: ...198 Monitoring VLAN and S VLAN Subinterfaces JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 258: ...226 Monitoring 802 3ad Link Aggregation JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 334: ...302 Troubleshooting JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 394: ...362 Monitoring Multiclass MLPPP JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 406: ...374 Monitoring POS JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 468: ...436 Troubleshooting JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 498: ...466 Monitoring Bridged Ethernet JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 546: ...514 Monitoring Cisco HDLC JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 747: ...Part 2 Index Index on page 717 Index 715...
Страница 748: ...716 Index JUNOSe 11 1 x Link Layer Configuration Guide...
Страница 774: ...742 Index JUNOSe 11 1 x Link Layer Configuration Guide...