GE Power Management
750/760 Feeder Management Relay
17-
1
17 COMMISSIONING
17.1 OVERVIEW
17
17 COMMISSIONING 17.1 OVERVIEW
17.1.1 DESCRIPTION
The following procedures can be used to verify the proper operation of the 750 and/or 760 Feeder Manage-
ment Relay
®
. Although not a total functional verification, the tests in this chapter check the major operating
points. Before commissioning the relay, users should read Chapter 3: INSTALLATION which provides impor-
tant information about wiring, mounting, and safety concerns. One should also become familiar with the relay
as described in Chapters 2: GETTING STARTED and 7: SETPOINTS.
17.1.2 REQUIREMENTS
The test procedures outlined in this section are for field verification that the relay is operational and pro-
grammed as required for the application.
It is not necessary to field test every characteristic of every relay feature. The various features are imple-
mented in software, which is thoroughly tested at the factory. Our recommendation is to field test all of the
input, display, and output hardware, and features which are to be operational in the specific application.
The setpoints which must be addressed for the measurement of every parameter and the operation of every
feature are shown on the logic diagrams. All settings must be set to the application requirement by the user
before beginning the tests. To facilitate testing it is recommended that all functions be initially set to Dis-
abled. Every feature which will be used in the application should be set to the required function for the
test, then returned to Disabled at completion. Each feature can then be testing without complications
caused by operations of other features. At the completion of all tests each feature is then set as
required.
The procedures for testing of common operations will not be repeated in every test. The common features, and
the test procedure location are as follows:
Thermal Exponential Demand Characteristic Measurement of Current Demand
Block Interval Demand Characteristic
Measurement of Current Demand
Rolling Interval Demand Characteristic
Measurement of Current Demand
Feature Function as 'Trip'
Phase Time Overcurrent 1
Feature Function as 'Alarm'
Phase Time Overcurrent 1
Feature Function as 'Control'
Phase Time Overcurrent 1
Fixed Delay Timing
Phase Time Overcurrent 1
Front Panel RESET Key Resetting
Phase Time Overcurrent 1
Logic Input Resetting
Phase Time Overcurrent 1
Feature Blocking from Logic Inputs
Phase Time Overcurrent 1
Element Operation of Output Relays
Phase Time Overcurrent 1
Number Of Faulted Phases
Phase Instantaneous Overcurrent 1
Feature Function as 'Trip + AR'
Autoreclose (760 Only)
We also recommend that the procedures outlined in Section 17.10: PLACING THE RELAY IN SERVICE on
page 17–74 be performed for all installations to verify proper operation and function of the equipment.
Содержание 750
Страница 2: ......
Страница 4: ......
Страница 124: ...8 14 750 760 Feeder Management Relay GE Power Management 8 12 INSTALLATION 8 S1 RELAY SETUP 8 ...
Страница 144: ...10 14 750 760 Feeder Management Relay GE Power Management 10 10 MISCELLANEOUS FUNCTIONS 10 S3 LOGIC INPUTS 10 ...
Страница 152: ...11 8 750 760 Feeder Management Relay GE Power Management 11 3 OUTPUT RELAYS 3 7 AUXILIARY 11 S4 OUTPUT RELAYS 11 ...
Страница 216: ...12 64 750 760 Feeder Management Relay GE Power Management 12 9 BREAKER FAILURE 12 S5 PROTECTION 12 ...
Страница 484: ...17 78 750 760 Feeder Management Relay GE Power Management 17 10 PLACING THE RELAY IN SERVICE 17 COMMISSIONING 17 ...
Страница 488: ...A 4 750 760 Feeder Management Relay GE Power Management A 1 FIGURES AND TABLES APPENDIXA A ...
Страница 490: ...B 2 750 760 Feeder Management Relay GE Power Management B 1 EU DECLARATION OF CONFORMITY APPENDIXB B ...
Страница 492: ...C 2 750 760 Feeder Management Relay GE Power Management C 1 WARRANTY INFORMATION APPENDIXC C ...
Страница 502: ...x 750 760 Feeder Management Relay GE Power Management INDEX ...
Страница 503: ...GE Power Management 750 760 Feeder Management Relay NOTES ...