GE Power Management
750/760 Feeder Management Relay
17-
37
17 COMMISSIONING
17.7 PROTECTION SCHEMES
17
17.7.25 OVERVOLTAGE 1 (2)
a) FOR WYE VTs
Test Connections per Figure 17–1: RELAY TEST WIRING – WYE CONNECTION on page 17–4.
Pickup with One Phase For Operation:
1.
Inject
V
an
=
V
bn
=
V
cn
= 0 into the bus voltage input of the relay. The PICKUP indicator should be off.
2.
Slowly raise
V
an
until the PICKUP indicator comes on. This is the pickup voltage.
3.
Lower
V
an
until the PICKUP indicator goes out. This is the reset voltage, which should be the pickup value
minus 2% of VT.
4.
Repeat steps 1 through 3 except adjust
V
bn
and
V
cn
in turn.
Pickup with Two Phases For Operation:
1.
Inject
V
an
=
V
bn
= nominal voltage and
V
cn
= a voltage above the pickup into the bus voltage input of the
relay. The PICKUP indicator should be off.
2.
Slowly raise
V
an
until the PICKUP indicator goes on. This is the pickup voltage of
V
an
.
3.
Reduce
V
an
until the PICKUP indicator goes off. This is the reset voltage of
V
an
which should be the pickup
value minus 2% of VT.
4.
Raise
V
an
until the PICKUP indicator comes on.
5.
Repeat steps 1 through 4, substituting
V
cn
for
V
an
,
V
an
for
V
bn
and
V
bn
for
V
cn
.
6.
Repeat steps 1 through 4, substituting
V
bn
for
V
an
,
V
cn
for
V
bn
and
V
an
for
V
cn
.
Pickup with Three Phases For Operation:
1.
Inject
V
an
=
V
bn
=
V
cn
= a voltage above the pickup voltage into the bus voltage input of the relay. The
PICKUP indicator should be on.
2.
Slowly lower
V
an
until the PICKUP indicator goes out. This is the reset voltage, which should be the pickup
value minus 2% of VT.
3.
Raise
V
an
until the PICKUP indicator comes on. This is the pickup voltage of
V
an
.
4.
Slowly lower
V
bn
until the PICKUP indicator goes out. This is the reset voltage, which should be the pickup
value minus 2% of VT.
5.
Raise
V
bn
until the PICKUP indicator comes on. This is the pickup voltage of
V
bn
.
6.
Slowly lower
V
cn
until the PICKUP indicator goes out. This is the reset voltage, which should be the pickup
value minus 2% of VT.
7.
Raise
V
cn
until the PICKUP indicator comes on. This is the pickup voltage of
V
cn
.
b) FOR DELTA VTs
Test Connections per Figure 17–2: RELAY TEST WIRING – DELTA CONNECTION on page 17–4.
Pickup with One Phase For Operation:
1.
Inject
V
ab
=
V
cb
= 0 into the bus voltage input of the relay. The PICKUP indicator should be off.
2.
Slowly raise
V
ab
until the PICKUP indicator comes on. This is the pickup voltage.
3.
Lower
V
ab
until the PICKUP indicator goes out. This is the reset voltage, which should be the pickup value
minus 2% of VT.
4.
Repeat steps 1 through 3 except adjust
V
bc
.
Содержание 750
Страница 2: ......
Страница 4: ......
Страница 124: ...8 14 750 760 Feeder Management Relay GE Power Management 8 12 INSTALLATION 8 S1 RELAY SETUP 8 ...
Страница 144: ...10 14 750 760 Feeder Management Relay GE Power Management 10 10 MISCELLANEOUS FUNCTIONS 10 S3 LOGIC INPUTS 10 ...
Страница 152: ...11 8 750 760 Feeder Management Relay GE Power Management 11 3 OUTPUT RELAYS 3 7 AUXILIARY 11 S4 OUTPUT RELAYS 11 ...
Страница 216: ...12 64 750 760 Feeder Management Relay GE Power Management 12 9 BREAKER FAILURE 12 S5 PROTECTION 12 ...
Страница 484: ...17 78 750 760 Feeder Management Relay GE Power Management 17 10 PLACING THE RELAY IN SERVICE 17 COMMISSIONING 17 ...
Страница 488: ...A 4 750 760 Feeder Management Relay GE Power Management A 1 FIGURES AND TABLES APPENDIXA A ...
Страница 490: ...B 2 750 760 Feeder Management Relay GE Power Management B 1 EU DECLARATION OF CONFORMITY APPENDIXB B ...
Страница 492: ...C 2 750 760 Feeder Management Relay GE Power Management C 1 WARRANTY INFORMATION APPENDIXC C ...
Страница 502: ...x 750 760 Feeder Management Relay GE Power Management INDEX ...
Страница 503: ...GE Power Management 750 760 Feeder Management Relay NOTES ...