14-
14
750/760 Feeder Management Relay
GE Power Management
14.5 UNDERVOLTAGE RESTORATION
14 S7 CONTROL
14
14.5 UNDERVOLTAGE RESTORATION
14.5.1 DESCRIPTION
This scheme is initiated by a trip of either the bus undervoltage 1 or 2 elements or the line undervoltage 3 or 4
elements. After the feeder breaker has been tripped, it will display message 'UVolt Restore Init' and operate
any programmed output relays. Once initiated it will monitor the bus voltage level, and send a close command
to the 2 CLOSE relay when the voltage on the programmed number of phases has risen above the pro-
grammed level for a selected time interval. The scheme is equipped with an incomplete sequence timer, so it
will not remain initiated for an indeterminate time, but will automatically reset if the voltage does not recover
during the programmed interval. Initiation of the scheme can be canceled by a reset command. Cancellation of
a previous initiation is only effective if the voltage is above the restoration threshold. A ‘Block Restoration’ logic
input is available to prevent both initiation and operation. It is recommended that if automatic undervoltage res-
toration is to be used, that the cold load pickup feature is also enabled, to prevent the breaker from tripping
shortly after it is automatically closed.
14.5.2 SETPOINTS
■
UNDERVOLT RESTORE
■
[ENTER] for more
The Undervoltage Restoration setpoints path is:
\ SETPOINTS \ S7 CONTROL \ UNDERVOLT RESTORE
UNDERVOLT RESTORE
FUNCTION: Disabled
Range: Disabled, Alarm, Latched Alarm, Control
Select the required function.
UNDERVOLT RESTORE
RELAYS (3-7):
Range: Any Combination of the 3-7 AUXILIARY Relays
Select the output relays required.
UNDERVOLT RESTORE
SOURCE: Bus
Range: Bus, Line
Select the voltage source for undervoltage restoration.
PHASES REQUIRED FOR
OPERATION: All Three
Range: Any One, Any Two, All Three
Select the type of operation required. This display is only available if the
UND-
ERVOLT RESTORE SOURCE
setpoint is set to
Bus
.
UNDERVOLT RESTORE
MIN VOLTS: 0.90 x VT
Range: 0.00 to 1.25 in steps of 0.01 x VT
Enter the minimum value of voltage required to permit undervoltage restoration
to close the breaker.
UNDERVOLT RESTORE
DELAY:
10 s
Range: 0 to 10000 in steps of 1 s
Select the interval for which the voltage must remain above the minimum level
to permit undervoltage restoration to close the breaker.
INCOMPLETE SEQUENCE
TIME:
100 min
Range: 1 to 10000 in steps of 1 min
Select the interval during which the scheme will remain in operation after hav-
ing been initiated, after which the operation will be canceled.
Содержание 750
Страница 2: ......
Страница 4: ......
Страница 124: ...8 14 750 760 Feeder Management Relay GE Power Management 8 12 INSTALLATION 8 S1 RELAY SETUP 8 ...
Страница 144: ...10 14 750 760 Feeder Management Relay GE Power Management 10 10 MISCELLANEOUS FUNCTIONS 10 S3 LOGIC INPUTS 10 ...
Страница 152: ...11 8 750 760 Feeder Management Relay GE Power Management 11 3 OUTPUT RELAYS 3 7 AUXILIARY 11 S4 OUTPUT RELAYS 11 ...
Страница 216: ...12 64 750 760 Feeder Management Relay GE Power Management 12 9 BREAKER FAILURE 12 S5 PROTECTION 12 ...
Страница 484: ...17 78 750 760 Feeder Management Relay GE Power Management 17 10 PLACING THE RELAY IN SERVICE 17 COMMISSIONING 17 ...
Страница 488: ...A 4 750 760 Feeder Management Relay GE Power Management A 1 FIGURES AND TABLES APPENDIXA A ...
Страница 490: ...B 2 750 760 Feeder Management Relay GE Power Management B 1 EU DECLARATION OF CONFORMITY APPENDIXB B ...
Страница 492: ...C 2 750 760 Feeder Management Relay GE Power Management C 1 WARRANTY INFORMATION APPENDIXC C ...
Страница 502: ...x 750 760 Feeder Management Relay GE Power Management INDEX ...
Страница 503: ...GE Power Management 750 760 Feeder Management Relay NOTES ...