Pickup with Two or Three Phases For Operation:
1.
Inject
V
ab
=
V
cb
> pickup into the bus voltage input. The PICKUP indicator should be on.
2.
Lower
V
ab
until the PICKUP indicator goes out. This is the reset voltage, which should be the pickup value
minus 2% of VT.
3.
Slowly raise
V
ab
until the PICKUP indicator comes on. This is the pickup voltage.
4.
Repeat steps 1 through 3 except adjust
V
bc
.
c) FOR WYE and DELTA VTs
Test Connections per Figure 17–1: RELAY TEST WIRING – WYE CONNECTION or Figure 17–2: RELAY
TEST WIRING – DELTA CONNECTION on page 17–4. Indications and Operations are as outlined under
Phase Time Overcurrent 1.
Blocking From Logic Inputs:
1.
Inject voltage to cause a pickup.
2.
Assert a logic input to provide a "Block 1 TRIP Relay".
Timing:
1.
Connect the “Stop Trigger."
2.
Set the voltage source to the required test voltage, then turn off voltage.
3.
Reset the timer. Turn the voltage on in the required number of phases, and measure the operating time.
Repeat steps 2 and 3 four more times and obtain an average of the time intervals.
4.
Reset the relay and disconnect the “Stop Trigger.”
17.7.26 NEUTRAL DISPLACEMENT (WYE VTs ONLY)
Test Connections per Figure 17–1: RELAY TEST WIRING – WYE CONNECTION on page 17–4.
Pickup Level:
1.
Apply a three phase balanced nominal voltage to the relay.
2.
Reduce
one
phase voltage slowly until the Neutral Displacement element operates. Note this voltage.
3.
Calculate the 3
V
o
(neutral voltage i.e. residual voltage) being supplied to the relay using the formula:
3
V
o
=
V
a
+
V
b
+
V
c
.
4.
Repeat steps 1 through 3 except adjust
V
bn
and
V
cn
in turn.
Blocking From Logic Inputs:
1.
Cause a pickup of the Neutral Displacement element.
2.
Assert a logic input to provide a "Blk Ntr Displacement". The PICKUP indicator should immediately go out.
3.
Repeat steps 1 and 2 for logic input “Block 1 TRIP Relay” as required.
Timing:
1.
Connect the Stop Trigger.
2.
Preset the neutral (residual) voltage to be 150% of the pickup setting.
3.
Inject the preset neutral (residual) voltage into the relay and note the delay time. Reset the timer.
4.
Repeat step 3 four more times and obtain an average of the time intervals. Disconnect the stop trigger
when finished.
Содержание 750
Страница 2: ......
Страница 4: ......
Страница 124: ...8 14 750 760 Feeder Management Relay GE Power Management 8 12 INSTALLATION 8 S1 RELAY SETUP 8 ...
Страница 144: ...10 14 750 760 Feeder Management Relay GE Power Management 10 10 MISCELLANEOUS FUNCTIONS 10 S3 LOGIC INPUTS 10 ...
Страница 152: ...11 8 750 760 Feeder Management Relay GE Power Management 11 3 OUTPUT RELAYS 3 7 AUXILIARY 11 S4 OUTPUT RELAYS 11 ...
Страница 216: ...12 64 750 760 Feeder Management Relay GE Power Management 12 9 BREAKER FAILURE 12 S5 PROTECTION 12 ...
Страница 484: ...17 78 750 760 Feeder Management Relay GE Power Management 17 10 PLACING THE RELAY IN SERVICE 17 COMMISSIONING 17 ...
Страница 488: ...A 4 750 760 Feeder Management Relay GE Power Management A 1 FIGURES AND TABLES APPENDIXA A ...
Страница 490: ...B 2 750 760 Feeder Management Relay GE Power Management B 1 EU DECLARATION OF CONFORMITY APPENDIXB B ...
Страница 492: ...C 2 750 760 Feeder Management Relay GE Power Management C 1 WARRANTY INFORMATION APPENDIXC C ...
Страница 502: ...x 750 760 Feeder Management Relay GE Power Management INDEX ...
Страница 503: ...GE Power Management 750 760 Feeder Management Relay NOTES ...