background image

For information on Taco’s Switching Relays (SR)
including catalog sheet, instruction sheets, Visio
stencils  and  our  highly  praised  Zone  Controls
Wiring Guide, scan the QR code to the left or go
to our website: http://www.taco-hvac.com.

Priority Operation:

When the priority dip switch is set to ON and the

priority zone is actuated, all other zones will stop operation until pri-
ority  zone  is  satisfied.  When  not  switched  to  priority,  all  zones  will
operate independently.

Mode  Operation:

When  the  dip  switch  is  set  to  NORMAL,  the  end

switch relay will be energized if any zone is in operation. When the switch
is set to RESET, the end switch relay will only be energized if the priority
zone is in operation, or through the operation of a plug-in reset control.

Primary Pump Operation:

When the dip switch is set to OFF, the pri-

mary circulating pump output will energize when any zone calls for heat,
except the priority zone.  When the dip switch is set to ON, the primary
circulating pump output will energize when any zone calls for heat.

Post Purge Operation:

When the dip switch is set to ON, the priority

zone  output  will  stay  energized  for  2  minutes  after  its  thermostat  or
aquastat is satisfied, but not operate the boiler.

Priority Protection Operation:

When  the  dip  switch  is  set  to  ON,

and  if  the  priority  zone  calls  continuously  for  more  than  one  hour,
power is returned to all the other zones, allowing each zone to function
independently.  Once  the  priority  zone  is  satisfied,  the  control's  auto-
reset is activated and the priority zone is again allowed to have priority
for up to one hour starting from when it calls next.  

Pump  Exercise  Operation:

When  the  dip  switch  is  set  to  ON,  the

solid  state  timer  cycles  all  the  circulating  pumps  that  are  attached  to
the Expandable Switching Relay at the selected time interval. The time
interval can be set for the pumps to run for either 30 seconds every 2
weeks or for 4 minutes every 24 hours.

Low Limit (ZC) Operation:

When the dip switch is set to ON and the

boiler drops below the set low limit (terminal ZC connected to boiler),

all zone circulating pumps will stop. When the boiler rises above the
set low limit, the zone circulating pumps are allowed to operate.

End Switches (Dry Contacts):

The main end switch closes when any

zone thermostat calls for heat and the mode switch is set to NORMAL.
The main end switch also closes when the mode switch is set to RESET
and a PC Series boiler reset power control is calling for heat. The priority
end switch closes only when the priority zone thermostat or aquastat is
calling for heat.

Expansion Connections: 

Set the expansion switch to MASTER on the

switching relay that has the designated priority zone or is utilizing the
PC Series plug-in option. Set all other daisy chained controls to SLAVE.
Using thermostat wire (18-22 gauge) connect between terminals A, B,
C  on  the  master  control  to  the  corresponding  A,  B,  C  on  the  SLAVE
control(s). Controls may be daisy chained up to 20 zoning panels using
any combination of -EXP controls (120 zones if all are 6 zone panels).

Thermostat Input (24 vac):

     

R

        Hot side of transformer. Connect to 

R

on thermostat.

     

W

       Switched 

signal from thermostat. Connect to 

on thermostat.

     

C

        Common side of transformer. Connect to 

COM

on 

               thermostat (optional).

     NET

   Network terminals 1 & 2 are tied together for wiring convenience

               when using communicating style thermostats (optional).

120 VAC Connections (N is Neutral, H is Hot):

    

Power Input             

Connect 120 Volt AC power

     Primary                     

Primary Pump (optional)

     Zone 1-3                    

Circulator Zones

     Priority Zone 4        

Priority Zone (if enabled) or Zone 4

     N/C Zone 4               

Normally closed terminals for the Priority Zone.

                                         Will deactivate on a Priority Zone call.

Cold Start Boiler 

Application:

Tankless Coil Boiler 

Application: (Alternative Wiring)

Instruction Sheet

SR504-EXP-4 Switching Relay

102-389

SUPERSEDES: December 20, 2013

EFFECTIVE: January 18, 2017

Plant ID# 9300-2874

For Both Cold Start Boiler Application and Tankless Coil Boiler Application (Alternative Wiring)

For Cold Start Boiler Application

Operation:

When any thermostat calls for heat, the appropriate circu-

lating  pump  is  energized  and  the  isolated  end  switch  (X  and  X)  will
start the boiler.

For Tankless Coil Boiler Application (Alternative Wiring)

Operation:

When any thermostat calls for heat, the boiler will be enabled

and appropriate circulating pump is energized when the boiler tempera-
ture is above the set low limit and low limit (ZC) dip switch is set to on.

ZC and ZR Terminals:

Connect terminal ZC to ZC terminal on the aqua-

stat control. Connect ZR to ZR terminal on the aquastat control. Confirm
polarity is consistent between boiler aquastat and switching relay.

WARNING:

When using Alternative Wiring diagram, wiring instruc-

tions must be followed so power originates from the boiler aquastat.
Failure to follow these wiring instructions may result in a secondary
source  of  power  being  connected  to  the  boiler  that  may  activate  it
under certain circumstances, causing injury or death.

Specifications:

PRODUCT            NUMBER                INPUT                   MAXIMUM                               TYPE 1 ENCLOSURE

NUMBER            OF ZONES            VOLTAGE         COMBINED LOAD              WIDTH        HEIGHT        DEPTH

SR504-EXP-4     4 with Priority   120/60/1 VAC             20 amps                       12

1

/

4

"              8"                 3"

All circulator relay connections, including ZC/ZR, are rated

1

/

3

hp (6 FLA, 36 LRA) at 120 VAC.

End switch connections are rated 24 VAC, 1 amp.

All thermostat connections supply a 24 VAC class 2 output.

For more wiring diagrams, visit 

www.taco-hvac.com

WARNING: 

Wiring  connections  must  be  made  in  accordance  with  all

applicable electrical codes. Use copper wire only. 120 VAC wiring must have
a minimum temperature rating of 75°C. Failure to follow this instruction
can result in personal injury or death and/or property damage. 12-18 gauge
wire recommended for 120 VAC connections, 14-22 gauge wire for thermo-
stat connections, and 14-22 gauge wire for 24 VAC source connections.

Отзывы: