
6 - WORKING OPERATIONS
5. Tilt the blade fully to the left. Read and note the gauge
information.
NOTE:
Adjust the pitch link in or out to get a starting angle
of about
7.0 °
.
RAIL14DOZ0527AA
4
6. Tilt the blade fully to the right. Read and note the gauge
information.
RAIL14DOZ0528AA
5
7. If the left-hand tilt angle is larger, adjust the pitch link
(C)
OUT (1/2 turn)
(D)
.
RAIL14DOZ0529AA
6
6-5
Содержание 2050M
Страница 22: ...1 GENERAL INFORMATION 1 16 ...
Страница 106: ...4 OPERATING INSTRUCTIONS 21 Check the controls for correct operation 4 4 ...
Страница 136: ...5 TRANSPORT OPERATIONS 5 14 ...
Страница 196: ...7 MAINTENANCE RAIL13DOZ1597GA 1 7 40 ...
Страница 197: ...7 MAINTENANCE RAIL13DOZ1598GA 2 7 41 ...
Страница 198: ...7 MAINTENANCE RAIL13DOZ0003GA 3 7 42 ...
Страница 242: ...7 MAINTENANCE 12 Close and lock the right hand side front access panel RAIL13DOZ0776AA 12 7 86 ...
Страница 264: ...7 MAINTENANCE RAIL12DOZ1024FA 2 7 108 ...
Страница 265: ...7 MAINTENANCE RAIL13DOZ1526GA 3 7 109 ...
Страница 267: ...7 MAINTENANCE Key Fuse function Amperage 7 Ignition 24V 50 A 8 Telematics 10 A 9 UCM 20 A 10 SCR 20 A 7 111 ...