
6 - WORKING OPERATIONS
Dozer blade pitch adjustment (if equipped)
Dozer blade pitch adjustment
1. Raise the dozer blade
100 mm
(
3.9 in
).
2. Release the dozer blade control lever, and shut the
engine off.
3. Remove the ignition key, and set the parking brakes.
4. Loosen the retaining bolt from the slotted keyway on
the strut.
5. Use a bar to adjust the strut clockwise or counter-clock-
wise until the desired pitch angle is reached, stopping
at 1/2–turn increments.
6. Replace the retaining bolt at the slotted keyway.
RCIL10CWL149AAL
1
Rearward position blade pitched rearward
When the top of the dozer blade pitch is set to the rear-
ward position, the blade will be able to push a larger
load. The blade will stay on top in soft ground. The
blade will not dig into the ground. Use the rearward
pitch position for fine grading.
Forward position blade pitched forward
When the top of the dozer blade pitch is set to the for-
ward position, the load slides off of blade as crawler
travels in reverse. The blade will dig into hard ground.
There will be less load spillage over the top of the blade.
6-3
Содержание 2050M
Страница 22: ...1 GENERAL INFORMATION 1 16 ...
Страница 106: ...4 OPERATING INSTRUCTIONS 21 Check the controls for correct operation 4 4 ...
Страница 136: ...5 TRANSPORT OPERATIONS 5 14 ...
Страница 196: ...7 MAINTENANCE RAIL13DOZ1597GA 1 7 40 ...
Страница 197: ...7 MAINTENANCE RAIL13DOZ1598GA 2 7 41 ...
Страница 198: ...7 MAINTENANCE RAIL13DOZ0003GA 3 7 42 ...
Страница 242: ...7 MAINTENANCE 12 Close and lock the right hand side front access panel RAIL13DOZ0776AA 12 7 86 ...
Страница 264: ...7 MAINTENANCE RAIL12DOZ1024FA 2 7 108 ...
Страница 265: ...7 MAINTENANCE RAIL13DOZ1526GA 3 7 109 ...
Страница 267: ...7 MAINTENANCE Key Fuse function Amperage 7 Ignition 24V 50 A 8 Telematics 10 A 9 UCM 20 A 10 SCR 20 A 7 111 ...