E6582062
1. Read first
1-14
1
9
The basic procedure to operate a motor with the inverter is as follows.
1. 5
Operation procedure
Check of packed items
-> [1.1 Check product purchase]
Reference
Check of installation site
-> [2.1.1 Installation environment]
Carrying-in to installation site
Installation
-> [2.1.2 How to install]
Removal of top cover -> [2.2 How to remove covers of inverter]
Removal of front cover
-> [2.2 How to remove covers of inverter]
Selection between sink logic/
source logic
-> [2.3.5 Control terminals]
Installation of insert type options
(If necessary)
->[10. 4 Selection of built-in options]
Wiring
Power terminal block -> [2.3.2 Standard connection method,
2.3.3 Power terminal]
Mounting of DC reactor -> [2.3.8 Mounting of DC reactor]
Control terminal block -> [2.3.2 Standard connection method],
[2.3.5 Control terminal]
Connection of communication cables -> [2.3.6 RS485 RS485
communication connectors], [2.3.7 Ethernet connectors]
Other wiring work in the inverter
- Wiring of built-in options -> [10. 4 Selection of built-in options]
- Connection change of cooling fan power supply (when a DC
power supply is used) -> [10. 5 Using DC power supply]
Connection of peripheral devices -> [Chapter 10]
Summary of Contents for TOSVERT VF-AS3
Page 2: ...1 9 ...
Page 14: ......
Page 17: ...E6582062 iii I 3 9 15 Warranty 15 1 16 Disposal 16 1 ...
Page 18: ......
Page 34: ......
Page 438: ......
Page 458: ......
Page 470: ......
Page 482: ......
Page 502: ......
Page 572: ......
Page 590: ......
Page 608: ......
Page 616: ......
Page 618: ......
Page 620: ......
Page 621: ...1 3 9 10 ...