![Siemens SIMOTICS S-1FK2 Operating Instructions Manual Download Page 80](http://html.mh-extra.com/html/siemens/simotics-s-1fk2/simotics-s-1fk2_operating-instructions-manual_379045080.webp)
4.6.1
STO acceptance test
Precondition
The converter is ready for operation.
● The converter signals neither faults nor alarms of the safety functions (r0945[0…7],
r2122[0…7]).
● STO is not active (r9734.0 = 0).
Procedure
Use the following procedure for the acceptance test of the Basic Function STO:
Switch on motor
1. Enter a speed setpoint ≠ 0.
2. Switch on the motor (ON command).
3. Check that the correct motor is running.
Select STO
1. Select STO while the motor is running.
Test each configured activation, e.g. via digital inputs and PROFIsafe.
2. Check the following:
– If a mechanical brake is not available, the motor coasts down.
A mechanical brake brakes the motor and holds it to ensure that it remains at a standstill.
– The converter signals neither faults nor alarms of the safety functions (r0945[0…7],
r2122[0…7]).
– The converter signals the following:
"STO is active" (r9734.0 = 1).
Deselect STO
1. Deselect STO.
2. Check the following:
– STO is not active (r9734.0 = 0).
– The converter signals neither faults nor alarms of the safety functions (r0945[0…7],
r2122[0…7]).
Safety functions integrated in the drive
4.6 Acceptance - completion of commissioning
SINAMICS S210 servo drive system
78
Operating Instructions, 12/2017, A5E41702836B AA
Summary of Contents for SIMOTICS S-1FK2
Page 2: ......
Page 766: ...Index SINAMICS S210 servo drive system 764 Operating Instructions 12 2017 A5E41702836B AA ...
Page 767: ......