![Omron C200HW Operation Manual Download Page 258](http://html1.mh-extra.com/html/omron/c200hw/c200hw_operation-manual_742329258.webp)
Appendix A
Data Calculation Standards
249
Forced Interruption Start Time
When the FORCED INTERRUPT command is executed during memory operation, the response time until the
designated sequence is started is as follows:
FORCED INTERRUPT
Pulse output
Time
Operation
NC113
NC213
NC413
FORCED
INTERRUPT
response
13 ms
13 ms
13 ms
Speed Change Response Time in Direct Operation
The target speed can be changed during direct operation by changing the speed data set in the operating data
area. The time from when the speed is changed until the change is reflected in the pulse output is as follows:
Speed designation
Pulse output
Before change
After change
Time
Operation
NC113
NC213
NC413
Speed change response
6 ms
6 ms
6 ms
Target Position Change Processing Time in Direct Operation
The target position can be changed during direct operation by changing the position data in the operating data
area and restarting the direct operation. The time from when the direct operation is restarted until the position
change is reflected in the pulse output is as follows:
Position designation
Pulse output
Before change
After change
Time
Direct operation
Operation
NC113
NC213
NC413
Position change response
8 ms
8 ms
8 ms
Summary of Contents for C200HW
Page 1: ...Cat No W334 E1 04 Position Control Units SYSMAC C200HW NC113 NC213 NC413 ...
Page 2: ...C200HW NC113 NC213 NC413 Position Control Units Operation Manual Revised July 2003 ...
Page 3: ...iv ...
Page 5: ...vi ...
Page 285: ...Cat No W334 E1 04 C200HW NC113 NC213 NC413 Position Control Units OPERATION MANUAL ...