10 - 20
MELSEC-A
10 ADVANCED POSITIONING CONTROL
10.5 Start program for advanced positioning control
10.5.1 Starting advanced positioning control
To execute advanced positioning control, a sequence program must be created to start
the control in the same manner as for main positioning control.
The following shows the procedure for starting the "1st point start block data"
(regarded as block No. 7000) set in axis 1.
1150
Y10
1178
PLC CPU
7000
1
ON
AD75
Input/output signal
Drive unit
Buffer memory
Control by designated
positioning data
* When carrying out a positioning start with the
next scan after a positioning operation is
completed, input signal X1 as an interlock so
that the start is carried out once the X1signal
turns OFF after the Y10 signal turns OFF.
1)
3)
2)
4)
1) Set "7000" in " Cd. 11 Positioning start No.".
(This establishes that the control as "advanced positioning control" using start block data.)
2) Set the point No. of the "start block data" to be started. (In this case "1".)
3) Turn ON the start signal.
4) The positioning data set in the "1st point start block data" is started.
Fig. 10.2 Advanced positioning control start procedure
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Summary of Contents for A1SD75P1-S3
Page 2: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...
Page 3: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...
Page 620: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...
Page 621: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...