6 - 1
Chapter 6
SEQUENCE PROGRAM USED
FOR POSITIONING CONTROL
The programs required to carry out positioning control with the AD75 are explained
in this chapter.
The sequence program required for control is created allowing for the "start conditions",
"start time chart", "device settings" and general control configuration. (The parameters,
positioning data, start block data and condition data, etc., must be set in the AD75
according to the control to be executed, and program for setting the control data or a
program for starting the various control must be created.)
The first half of this chapter explains the program configuration of general control, and
the latter half explains the program details. Create the required program while referring
to the various control details explained in "SECTION 2", and to "Chapter 5 DATA USED
FOR POSITIONING CONTROL".
6.1 Precautions for creating program ................................................................................ 6- 2
6.2 List of devices used ...................................................................................................... 6- 4
6.3 Creating
a
program ...................................................................................................... 6-
8
6.3.1
General configuration of program .................................................................. 6- 8
6.3.2
Positioning control operation program ........................................................... 6- 9
6.4 Positioning program examples....................................................................................6- 12
6.5 Program
details ...........................................................................................................6- 21
6.5.1
Initialization
program......................................................................................6-
21
6.5.2
Start details setting program..........................................................................6- 22
6.5.3
Start
program .................................................................................................6-
23
6.5.4
Continuous operation interrupt program .......................................................6- 31
6.5.5
Restart
program .............................................................................................6-
33
6.5.6
Stop
program .................................................................................................6-
36
6
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Summary of Contents for A1SD75P1-S3
Page 2: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...
Page 3: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...
Page 620: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...
Page 621: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...